17
28.
2x
2x
29.
30.
Fig. 8
Siting
Required room height: at least 2100 mm
Preparing for boiler installation
A connection set, available as an accessory, must be
used to make the connections on the gas and water
sides.
Fitting accessories
Fit all accessories that are installed at the back of the
boiler (e.g. connection sets).
!
Please note
Avoid appliance damage.
Connect all pipework free of load and torque
stress.
Preparing the connections on site:
Connection set installation instructions
Preparing for installation
Installation preparations
(cont.)
5773 238 GB
Installation
Содержание 7513244
Страница 11: ...11 8 9 4x 8x 12 10 11 Fig 2 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 12: ...12 13 14 15 Fig 3 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 13: ...13 16 Fig 4 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 14: ...14 sF 17 19 21 20 18 Fig 5 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 15: ...15 24 22 23 Fig 6 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 16: ...16 27 26 25 Fig 7 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 35: ...35 2x 1 4 2 3 5 Fig 27 Installation sequence Fitting the front panels 5773 238 GB Installation ...
Страница 135: ...135 Parts lists Hydraulic assembly 5773 238 GB Components ...
Страница 146: ...146 0004 0002 0005 0006 0001 0003 Fig 107 Parts lists Miscellaneous 5773 238 GB Components ...