background image

IMPORTANT NOTE 

 

THESE INSTRUCTIONS MUST BE READ 

 

AND UNDERSTOOD BEFORE INSTALLING, 

 

COMMISSIONING, OPERATING OR 

 

SERVICING EQUIPMENT 

LILLIPUT HE 

 

GAS/OIL FIRED 

CAST IRON SECTIONAL 

BOILERS 

 
 

INSTALLATION, COMMISSIONING AND 

MAINTENANCE INSTRUCTIONS

 

 

Содержание LILIPUT HE

Страница 1: ...SE INSTRUCTIONS MUST BE READ AND UNDERSTOOD BEFORE INSTALLING COMMISSIONING OPERATING OR SERVICING EQUIPMENT LILLIPUT HE GAS OIL FIRED CAST IRON SECTIONAL BOILERS INSTALLATION COMMISSIONING AND MAINTE...

Страница 2: ......

Страница 3: ...ISSION OPERATE OR MAINTAIN THIS UNIT THE LILLIPUT BOILER IS INTENDED FOR USE AS A COMMERCIAL APPLIANCE AND IS NOT CERTIFIED FOR USE IN DOMESTIC APPLICATIONS GAS FIRED VARIANTS OF THE LILLIPUT BOILER R...

Страница 4: ...il Supply 3 6 Flue System 3 7 Ventilation and Air Supply 3 7 1 Natural Ventilation 3 7 2 Mechanical Ventilation 4 0 WATER SYSTEM 7 4 1 Pipework 4 2 Pumps 4 3 Vent Pipe 4 4 Safety Valve 4 5 Pressure Ga...

Страница 5: ...ater Flow Rates and Pressure Drops 7 Table 4 Composition of Sections within Heat Exchanger 10 FIGURES Figure 1 Overall Dimensions and Clearances 3 Figure 2 Boiler Control Panel Wiring Diagram 9 Figure...

Страница 6: ...be used individually or in a multiple boiler configuration and are suitable for use on either open vented or sealed low temperature hot water heating systems For hot water production they can be used...

Страница 7: ...AS VOLUME AT NTP NAT GAS m3 h ft3 h 90 0 3178 118 2 4174 APPROX FLUE GAS TEMP NAT GAS deg C 190 FLUE DRAUGHT REQUIRED AT BOILER OUTLET mbar in wg 0 1 0 25 0 04 0 10 WEIGHT FILLED WITHOUT BURNER kg lb...

Страница 8: ...Dimensions and Clearances Fig 1 Overall Dimensions and Clearances BOILER MODEL Lmm Hmm Amm Gas Amm Oil Bmm Cmm Dmm min LILLIPUT HE 65 800 530 347 261 400 500 400 LILLIPUT HE 90 960 530 389 261 400 500...

Страница 9: ...allation commissioning and maintenance c British Gas Publications IM 2 Purging procedures for non domestic gas installations IM 5 Soundness testing procedures for industrial and commercial gas install...

Страница 10: ...sh Standards and Local Authority Regulations Oil Supply Lines The oil supply line s between storage tank and burner should be run in copper steel or aluminium pipe Galvanised pipes and fittings should...

Страница 11: ...output and above The following notes are given as general guidance 3 7 1 Air Supply by Natural Ventilation The boiler room must have or be provided with permanent air vents directly to the outside ai...

Страница 12: ...d be taken into account when selecting the circulating pump for the system In the case of open vented systems it is essential that the pump does not pump over i e push water out of the open vent pipe...

Страница 13: ...ief safety valve of approved manufacture and sized to match the boiler s rating in accordance with BS 6644 should be installed in the flow pipe between the boiler s and open vent pipe connection The s...

Страница 14: ...The boiler control panel includes a terminal block for all electrical connections to the boiler Refer to Fig 2 below Wiring diagrams showing the electrical connection of burner to boiler are given in...

Страница 15: ...One front section F Intermediate sections I Special intermediate sections SI For the purposes of identification the Intermediate sections have a joint face between the middle and upper part of the se...

Страница 16: ...oiler sections Check that the cut outs A are positioned around the rear spacers and secure in position with duct tape A Fit the rear insulation jacket over the flue outlet Secure the top and side edge...

Страница 17: ...cable entry hole A is at the front of the boiler Se cure the top cover to the rear cover using the 4x10 self tapping screws B A B B Remove the cable entry blanking plate A from the control con sole a...

Страница 18: ...r as detailed in British Gas Publications IM 5 and IM 2 respectively Check that gas meter is operational and has been checked by the local region of British Gas Check that gas meter and supply pipewor...

Страница 19: ...aximum pressure of gas train governor is not exceeded i Adjust start and main output gas rates as detailed in the manufacturer s technical information supplied with the gas train j Check that overheat...

Страница 20: ...ISOLATOR AND SHUT OFF FUEL SUPPLY TO BOILER a a For oil installations Desludge oil storage tank and examine for leaks and signs of deterioration b Examine contents gauge for visibility and clean or r...

Страница 21: ...LLIPUT HE 500001047 F 16 i h Check all flue joints for integrity j i Check ventilation ducts grilles to boiler room and ensure they are clear k j Re commission boiler as detailed in relevant parts of...

Страница 22: ...Hexagonal bush 1 BSP 573405119 9 Thermostat pocket 573405228 10 Plug BSP 573405121 11 Door hinge 573405229 12 Insulation front door 573405230 13 Insulation front 573405231 14 Front door 573405232 15...

Страница 23: ...HAMWORTHY HEATING LTD LILLIPUT HE 500001047 F 18 Fig 4 Exploded View of Boiler 26 Item 26 insulation to be placed between refractory brick and door casting...

Страница 24: ...LIGHT L N 3 WIRE BURNER CONNECTION FOR REMOTE LOCKOUT LAMP OR VOLT FREE SIGNAL FOR OVER TEM PERATURE LOCKOUT FOR BURNER WORKING SIGNAL FOR EXTERNAL THERMOSTAT OR PRESSURE SWITCH FOR EXTERNAL PUMP SWI...

Страница 25: ...mm 616 776 Combustion Chamber Type Reversed BURNER TYPE FOR GAS INSTALLATIONS Burner Manufacturer RIELLO BURNER MODEL 40 GS10 40 GS10 Blast Tube Penetration Dimension A mm 110 110 Burner Manufacturer...

Страница 26: ...HAMWORTHY HEATING LTD LILLIPUT HE 500001047 F 21 INSTALLER SITE ADDRESS BOILER TYPE BOILER SIZE S UNIT NO S SERIAL NO S FLUE NOTES...

Страница 27: ......

Страница 28: ......

Отзывы: