55
Note
According to EN 806, a visual inspection and (if neces-
sary) cleaning must be carried out no later than two
years after commissioning, and as required thereafter.
2.
Fig. 47
1.
Drain the loading cylinder.
2.
Remove flange cover
B
.
3.
Disconnect the loading cylinder from the pipework
to prevent contamination from entering the pipe
system.
4.
Remove loose deposits with a high pressure
cleaner.
!
Please note
When cleaning the inside,
only use plastic cleaning utensils.
5.
Use a chemical cleaning agent to remove hard
deposits that cannot be removed with a high pres-
sure cleaner.
!
Please note
Never use hydrochloric acid
based cleaning agents.
6.
Thoroughly flush the loading cylinder after cleaning.
Checking and replacing the magnesium anode (if required)
Check the magnesium anode. If the anode has degra-
ded to between 10 and 15 mm Ø, we recommend
replacing the magnesium anode.
Commissioning, inspection, maintenance
Cleaning the loading cylinder
5773 238 GB
Содержание 7513244
Страница 11: ...11 8 9 4x 8x 12 10 11 Fig 2 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 12: ...12 13 14 15 Fig 3 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 13: ...13 16 Fig 4 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 14: ...14 sF 17 19 21 20 18 Fig 5 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 15: ...15 24 22 23 Fig 6 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 16: ...16 27 26 25 Fig 7 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 35: ...35 2x 1 4 2 3 5 Fig 27 Installation sequence Fitting the front panels 5773 238 GB Installation ...
Страница 135: ...135 Parts lists Hydraulic assembly 5773 238 GB Components ...
Страница 146: ...146 0004 0002 0005 0006 0001 0003 Fig 107 Parts lists Miscellaneous 5773 238 GB Components ...