Checking the power supply
Filling the heating system
Fill water
!
Please note
Unsuitable fill water increases the level of
deposits and corrosion and may lead to appli-
ance damage.
■
Flush the heating system thoroughly before
filling.
■
Only use fill water of potable water quality.
■
Antifreeze suitable for heating systems can be
added to the fill water. The antifreeze manu-
facturer must verify its suitability.
■
Fill and top-up water with a water hardness in
excess of the following values must be soft-
ened, e.g. with a small softening system for
heating water.
Total permissible hardness of the fill and top-up water
Total heating output
Specific system volume
kW
< 20 l/kW
≥
20 l/kW to < 50 l/kW
≥
50 l/kW
≤
50
≤
3.0 mol/m
3
(16.8 °dH)
≤
2.0 mol/m
3
(11.2 °dH)
< 0.02 mol/m
3
(0.11 °dH)
>
50 to
≤
200
≤
2.0 mol/m
3
(11.2 °dH)
≤
1.5 mol/m
3
(8.4 °dH)
< 0.02 mol/m
3
(0.11 °dH)
>
200 to
≤
600
≤
1.5 mol/m
3
(8.4 °dH)
≤
0.02 mol/m
3
(0.11 °dH)
< 0.02 mol/m
3
(0.11 °dH)
>
600
< 0.02 mol/m
3
(0.11 °dH)
< 0.02 mol/m
3
(0.11 °dH)
< 0.02 mol/m
3
(0.11 °dH)
A
B
Fig. 28
Shown with connection set for finished walls
(accessories)
1.
Check the pre-charge pressure of the diaphragm
expansion vessel. See page 56.
2.
Close the gas shut-off valve.
3.
Open shut-off valves
B
on the heating water side.
Commissioning, inspection, maintenance
Removing the front panels
5773 238 GB
Содержание 7513244
Страница 11: ...11 8 9 4x 8x 12 10 11 Fig 2 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 12: ...12 13 14 15 Fig 3 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 13: ...13 16 Fig 4 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 14: ...14 sF 17 19 21 20 18 Fig 5 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 15: ...15 24 22 23 Fig 6 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 16: ...16 27 26 25 Fig 7 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 35: ...35 2x 1 4 2 3 5 Fig 27 Installation sequence Fitting the front panels 5773 238 GB Installation ...
Страница 135: ...135 Parts lists Hydraulic assembly 5773 238 GB Components ...
Страница 146: ...146 0004 0002 0005 0006 0001 0003 Fig 107 Parts lists Miscellaneous 5773 238 GB Components ...