56
2.
Fig. 48
1.
Reconnect the loading cylinder to the pipework.
2.
Insert new gasket at flange cover
B
.
3.
Fit flange cover
B
and tighten the 8 screws with a
maximum torque of 25 Nm.
4.
Push the earth cable onto tab
C
.
5.
Fit cover
A
.
6.
Fill the loading cylinder with potable water.
Checking the diaphragm expansion vessel and system pressure
A
Fig. 49
Commissioning, inspection, maintenance
Re-assembling and filling the loading cylinder
5773 238 GB
Содержание 7513244
Страница 11: ...11 8 9 4x 8x 12 10 11 Fig 2 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 12: ...12 13 14 15 Fig 3 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 13: ...13 16 Fig 4 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 14: ...14 sF 17 19 21 20 18 Fig 5 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 15: ...15 24 22 23 Fig 6 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 16: ...16 27 26 25 Fig 7 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 35: ...35 2x 1 4 2 3 5 Fig 27 Installation sequence Fitting the front panels 5773 238 GB Installation ...
Страница 135: ...135 Parts lists Hydraulic assembly 5773 238 GB Components ...
Страница 146: ...146 0004 0002 0005 0006 0001 0003 Fig 107 Parts lists Miscellaneous 5773 238 GB Components ...