37
IM-HC 599871 0321 RABS
Installation and Assembly
The control unit has five sockets for attaching RABS components. The
RABS components they interface with are discussed in this section.
Sockets on the control unit:
Circuit hubs
3.3.4 “Assemble the Circuit Hubs” on page 33
Supply sensor
Socket for future radiant cooling function
“Connect the Circuit Hubs to the Control Unit” on page 37
WLAN module
3.3.8 “WLAN Module” on page 44
External output
Socket for future radiant cooling function
“Socket for Future Radiant Cooling Function” on page 39
Connect the Circuit Hubs to the Control Unit
X
Attach the long ribbon cable (31.5 inch) to the far left socket on the
control unit.
X
Insert the plug of the long ribbon cable (included with the control
unit) into the socket of the control unit until it fits snuggly.
X
Press the long ribbon cable into the strain relief recess below the
socket to ensure the housing faceplate closes readily.
AKT
OR
VL-TEMP
TA
UP
.
RS-23
2
Содержание RABS 1250.7US
Страница 1: ...Installation Manual Radiant Auto Balancing System RABS For Radiant Heating Systems 03 2021...
Страница 103: ......