29
IM-HC 599871 0321 RABS
Installation and Assembly
3 Installation and Assembly
3.1
Transportation and Storage
Observe the following during transportation and storage:
Avoid impacts and vibrations.
Store components in a clean and dry place.
Do not remove the components from the packaging until immediately
before use.
NOTICE!
Defective components must be replaced. Do not attempt to
repair them.
3.2 Assembly Information
3.2.1 Installation Requirements
Power
The RABS control unit requires access to a 120V wall outlet within reach
of the integrated power adapter (~36 inches).
Manifolds
RABS components are designed to work with Viega's 1¼ inch stainless
manifolds (Model 2804 or Model 2879).
1
2
3
4
5
Figure 14: Stainless Manifold with RABS
1 - Return header
2 - Return header connection end
3 - Tubing connection end
4 - Return sensor port
5 - Circuit hub
Содержание RABS 1250.7US
Страница 1: ...Installation Manual Radiant Auto Balancing System RABS For Radiant Heating Systems 03 2021...
Страница 103: ......