CFDV Series Gas Fireplace
42
20306739
JUNCTION BOX WIRING
1. This should be done before framing the fireplace. Wire
the receptacle into an electrical circuit. Wire with mini-
mum 60° C wire in accordance with prevailing codes.
2. Remove the external junction box cover by removing
the screw from the side of the outside firebox wall.
Junction box was installed at the factory.
3. The junction box cover has a factory installed “romex”
style strain relief connector. After connecting the wires,
route the wire leads through this connector. Refer to
the wiring diagram in
Figure 75
.
Figure 75 –
Junction Box Wiring Diagram
FP1912
Junction box wiring
8/08
Junction Box
Factory Supplied
Not Supplied
120V AC
60Hz
ELECTRICAL INSTALLATION – IPI
WALL SWITCH INSTALLATION
The wall switch wire connection is located off the wire
harness coming out of the IPI Control Board. The wire is
labeled 'wall switch'. Connect the low voltage switch wires
to the two (2) terminals labeled "wall switch" from the control
board. Run wire to desired location on wall. Up to 50 feet
of 18 gauge wire may be used if necessary. Attach wires
to wall switch. Mount the wall switch in a junction box and
screw on cover.
Figure 76
Do NOT connect wall switch to 110V circuit.
WARNING
Содержание 33CFDVNI
Страница 66: ...CFDV Series Gas Fireplace 66 20306739...
Страница 67: ...CFDV Series Gas Fireplace 20306739 67...