background image

CFDV Series Gas Fireplace

20306739

37

ELECTRICAL INSTALLATION – MILLIVOLT

OPTIONAL FAN/BLOWER SYSTEMS – 

BLOT

The junction box for the fan/blower systems has been 

factory installed. This system requires that 110-120 VAC 

to be wired to the factory installed junction box before the 

fireplace is permanently installed. 

Figure 72

Black

Black

Green

Black

Black

White

Thermostatic
Switch

Receptacle

Junction Box

120V AC

FP2296
blower wiring

Speed Control

Thermostatic 

Control Blower

FP2296

Figure 72 – 

BLOT Blower Wiring Diagram

OPTIONAL FAN/BLOWER SYSTEMS – FK12

Figure 73 – 

FK12 Fan

AC552

BR/BC FAN KIT

10/31/97

AC552

Содержание 33CFDVNI

Страница 1: ...ervice or maintenance can cause injury or property damage Refer to this manual For assistance or additional information consult a qualified installer service agency or the gas supplier Thisappliancema...

Страница 2: ...witch 36 Optional DC Remote Systems 36 Optional Fan Blower System BLOT 37 Optional Fan Blower System FK12 37 Operating Instructions Millivolt 38 For Your Safety Read Before Lighting 38 What To Do If Y...

Страница 3: ...ed combustion leakage can occur CARBON MONOXIDE POISONING Early signs of carbon monoxide poisoning are similar to the flu with headaches dizziness and or nausea If you have these signs the fire place...

Страница 4: ...replace any part of the control system and any gas control which has been under water 22 Do not operate fireplace if any log is broken 23 Do not use a blower insert heat exchanger insert or any other...

Страница 5: ...ICATIONS ORIFICE SIZE GAS PRESSURES Natural Gas Propane LP Inlet Minimum 5 5 w c 11 0 w c Inlet Maximum 14 0 w c 14 0 w c Manifold Pressure 3 5 w c 10 0 w c COLD CLIMATE OPTION IPI Models Only NOTE If...

Страница 6: ...luded Four 4 AA alkaline batteries NOTE To ensure you will always have back up pow er available to your fireplace replace batteries before each heating season Four 4 AA alkaline batteries are required...

Страница 7: ...ying with Local Codes Pipe Sealant Approved for use with Propane LPG Resistant to Sulfur Compounds FIREPLACE FRAMING Firebox framing can be built before or after the appliance is set in place Construc...

Страница 8: ...343 4 883 mm D 27 689 mm 291 8 740 mm 331 8 841 mm E 18 457 mm 197 8 505 mm 197 8 505 mm F 157 8 430 mm 157 8 430 mm 157 8 430 mm G 211 8 537 mm 221 8 562 mm 261 2 673 mm H 231 4 591 mm 255 8 657 mm 2...

Страница 9: ...ty where gasoline or other flammable liquids may be stored Vent pipe routing See Venting section found in this manual for allowable venting configurations These units can be installed in a bedroom See...

Страница 10: ...i e remote control wall switch and optional fan must be done prior to final finishing to avoid costly reconstruction Only noncombustible materials i e brick tile slate steel or other materials with a...

Страница 11: ...e Screws 7 Collar FP3022 Figure 12 Remove 7 Collar and Gasket 3 Remove the plate with the 4 collar and gasket by re moving four 4 screws Set aside Figure 13 4 Remove the top plate located on top of th...

Страница 12: ...e 16 Remove Small Square Plate and Gasket 8 Install the plate with the 4 collar and gaskets on top of the unit with screws previously removed 9 Install the plate with the 7 collar and gaskets on top o...

Страница 13: ...ents or clearance considerations detailed in this manual Venting terminals shall not be recessed into a wall or sid ing Vertical side wall venting in horizontal applications must be installed with a 1...

Страница 14: ...U h 30kW 36 91cm for appliances 100 000 BTU h 30kW 6 15cm for appliances 10 000 BTU h 3kW 9 23cm for appliances 10 000 BTU h 3kW and 50 000 BTU h 15kW 12 30cm for appliances 50 000 BTU h 15kW C Cleara...

Страница 15: ...mbustible Noncombustible 12 305 mm M Balcony with perpendicular side wall M 12 305 mm P 6 152 mm M F Alcove Applications C D C E V V Combustible Noncombustible E Min 2 51 mm for non vinyl sidewalls Mi...

Страница 16: ...flues shall be sealed in this manner unless otherwise stated VENTING INSTALLATION Note The end of the pipe sections with the lances tabs on it will face toward the appliance 1 Align Seams 2 Rotate Fig...

Страница 17: ...too long the inner and outer flues of the slip section can be cut to the desired length WARNING Risk of Fire Explosion DO NOT break seals on slip sections Use care when re moving termination cap from...

Страница 18: ...25 mm clearance at the sides and bottom until the flue penetrates the outside wall A minimum 1 clearance all around the flue is acceptable at this point of penetration If vertical rise is 71 2 feet 2...

Страница 19: ...iance or end of the 45 elbow in a corner ap plication and the outside face of the rear wall is 20 508 mm Figure 23 Only one 45 elbow is allowed in these installations Minimum clearances between vent p...

Страница 20: ...AP WARNING Risk of Fire The telescoping flue sec tion of the termination cap MUST be used when connecting vent 11 2 38 mm minimum overlap of vent and telescoping flue section is required Failure to ma...

Страница 21: ...ent pipes and combus tible materials is 3 76 mm on top and 1 25 mm on the bottom and sides unless otherwise noted When vent termination exits through foundations less than 20 508 mm below siding outcr...

Страница 22: ...th of the horizontal run MUST be reduced by 18 457 mm This does not apply if the 45 elbows are installed on the vertical part of the vent system The maximum number of elbow degrees in a system is 270...

Страница 23: ...vent vertical through the roof installa tions install the supplied flue restrictors onto the top edge of the firebox flue adapter according to the Vertical Side wall Installation Flue Restrictor Char...

Страница 24: ...Figure 43 Vertical Height Requirements X X FP1182 Figure 44 Horizontal Length Requirement to the wall with screws provided and caulk around the wall plate to weatherproof As an alternative to screwin...

Страница 25: ...ings should be equally spaced to prevent the inside and outside flex pipe from touching each other and should be placed in locations where the vent must bend 11 Extend 65 8 outside flex pipe to reach...

Страница 26: ...tight seal is made around the vent pipe coming through the wall BG401 Snorkel 2 10 99 djt Snorkel Wall Screws Foundation Recess Watertight Seal Around Pipe Sheet Metal Screws BG401 Figure 48 Snorkel i...

Страница 27: ...n 8 2 5 m vertical rise is required Two sets of 45 elbow offsets may be used within the vertical sections From 0 to a maximum of 8 2 5 m of vent pipe can be used between elbows Figure 52 SLP HVS suppo...

Страница 28: ...starter into the starting collar of the appliance 2 Slide the small gear clamp over the inner flexible vent pipe and push out of the way 3 Pull and extend the inner flexible vent 4 Slide the inner ve...

Страница 29: ...floor Figure 55 Frame the area with the same sized lumber as used in ceiling floor joist When installing a top vent vertical termination appliance the hole should be directly above the appliance unles...

Страница 30: ...maintain clearance Roof Support 1 Fasten the roof support to the roof sheathing using 2 wood screws provided Figure 58 Ensure that the termination pipe is centered and has a minimum of 1 clearance on...

Страница 31: ...rom roof to lowest discharge opening 24 in min 610 mm Roof Pitch H Min Ft Roof Pitch H Min Ft Flat to 6 12 1 0 Over 11 12 to 12 12 4 0 Over 6 12 to 7 12 1 25 Over 12 12 to 14 12 5 0 Over 7 12 to 8 12...

Страница 32: ...pipe of the rig id pipe length using three 3 self tapping 10 screws 2 Attach the outer flex adapter to the outer pipe of the rigid pipe lenth using three 3 self tapping 10 screws 3 Attach the 4 and 6...

Страница 33: ...r If you do not reduce incoming gas pressure burner system regulator damage could occur Install external regulator with the vent pointing down as shown in Figure 66 Pointing the vent down protects it...

Страница 34: ...e LP From External Regulator 11 w c to 13 w c Pressure Apply pipe joint sealant lightly to male threads This will prevent excess sealant from going into pipe Excess seal ant in pipe could result in cl...

Страница 35: ...0 latest edition and Canadian Electrical Code CSA C22 1 WARNING 4 To adjust flame height turn HI LO knob to HI to get maximum pressure to burner Turn HI LO knob to LO to get minimum pressure 5 To chec...

Страница 36: ...ays check with local code Figure 70 Wiring Diagram for Wall Switch ELECTRICAL INSTALLATION MILLIVOLT OPTIONAL DC REMOTE SYSTEMS See section entitled Hearth Mount in the Millivolt hand held remote inst...

Страница 37: ...equires that 110 120 VAC to be wired to the factory installed junction box before the fireplace is permanently installed Figure 72 Black Black Green Black Black White Thermostatic Switch Receptacle Ju...

Страница 38: ...tempted repair may result in a fire or explosion D Do not use this appliance if any part of it has been under water Immediately call a qualified service technician to inspect the appliance and to repl...

Страница 39: ...ess fully and hold pilot gas knob Depress piezo igniter as many times as needed to ignite pilot Keep knob fully depressed for 30 60 seconds Release and check that pilot continues to burn If the pilot...

Страница 40: ...to ignite MAIN BURNER SWITCH This switch allows you to turn on and to turn off the main burner without using the gas valve knob Make sure the switch is in the ON position to light the main burner Depr...

Страница 41: ...en servicing controls Wiring errors can cause improper and dangerous operation Figure 74 IPI Valve FP3034 IPI gas valve Pressure Inlet Pilot Adjust ment Screw Pressure Outlet Do NOT use open flame to...

Страница 42: ...his connector Refer to the wiring diagram in Figure 75 Figure 75 Junction Box Wiring Diagram FP1912 Junction box wiring 8 08 Junction Box Factory Supplied Not Supplied 120V AC 60Hz ELECTRICAL INSTALLA...

Страница 43: ...AUTION Electrical connections should only be performedbyaqualified licensedelectrician Main power supply must be turned off before connecting fans to the main electrical power supply or performing ser...

Страница 44: ...ctions If you cannot reach your gas supplier call the fire department C Turn Master Switch to ON position by hand Never use tools If the switch will not function by hand do not try to repair it Call a...

Страница 45: ...the prior page If you do not smell gas go to next step 4 Press the wall switch to the ON position Sparker will spark and pilot flame will light 5 Once pilot flame is established the main burner flame...

Страница 46: ...Red LED Flash 5 times Pilot valve voltage error Red LED Flash 6 times Main valve voltage error Red LED Flash 7 times Low battery Red LED 2 5 sec Flash once REMOTE FUNCTION OPERATION ICON Fireplace On...

Страница 47: ...t glass frame aside Figure 78 Remove Safety Barrier and Glass Frame CAUTION Each latch has a quick spring force When reinstalling glass keep fingers clear FP3041 glass frame latch Figure 77 Glass Fram...

Страница 48: ...4 Self drilling 8 screws NOTE If logs are being used porcelain panels must be installed first 1 Remove safety barrier glass frame and stones fire glass or logs if applicable 2 Remove top heat shield 3...

Страница 49: ...glow Adjust embers as necessary to achieve an even and clean flame KT1893 firebrick Retainer Bracket Left Panel Rear Panel Right Panel KT1893 INSTALLING BRICK LINER KIT Kit contents One 1 Right panel...

Страница 50: ...3 Bend the tab in the center front of the false hearth up to a 90 angle Figure 87 Place the top log 4 by resting the square notch located on the bottom of the log over the tab mentioned above Rest the...

Страница 51: ...re 88 Center Tab Figure 87 LG1183 Figure 89 LAVA ROCK PLACEMENT Sprinkle lava rock on the raised floor of the inner combus tion chamber Evenly distribute the rock Figure 89 Do not sprinkle the lava ro...

Страница 52: ...frame assembly by releasing the latches on top of the fireplaces and tilting frame for ward Lift off and set aside 4 Remove the logs if they are installed Vacuum the rock wool off the burner 5 Remove...

Страница 53: ...d or barrier removed for servicing the appliance must be replaced prior to operating the appliance See parts list for model number SAFETY BARRIER INSTALLATION INSTRUCTIONS DANGER HOT GLASS WILL CAUSE...

Страница 54: ...eplace manufacturer No substitute materials may be used Handle glass door with care to avoid striking or scratch ing it on hard objects To clean glass door follow Glass Removal procedure outlined in t...

Страница 55: ...eplace pilot assembly B If thermocouple is producing more than 15 mV replace faulty valve 3 Pilot burning valve knob turned to ON switch is turned to ON but burner will not ignite A Defective switch w...

Страница 56: ...function Check the cold climate switch and control board Replace cold climate switch Battery polarity wrong Batteries low AC adaptor plugged into junction box Reinstall batteries correctly Change batt...

Страница 57: ...Kit Bronze GKB Glass Kit Diamond GKD Glass Kit Onyx GKO Glass Kit Sapphire GKS Blower Kits T Stat Blower w Speed Control BLOT Manual Blower FK12 Speed Control for FK12 26D0746 SYMPTOM POSSIBLE CAUSE A...

Страница 58: ...6CFDVSB 42CFDVSB 7 Control Panel Access Door 1 20305572 20307388 20306117 Kits Sold Separately 6 Blower 1 BLOT BLOT BLOT 6 Manual Blower 1 FK12 FK12 FK12 N A Firebrick Kit Cottage Clay 1 FB33CFDVCC FB...

Страница 59: ...D0019K 37D0018K 37D0019K 37D0018K 37D0019K 5 Replacement Thermocouple 1 24D0808 24D0808 24D0808 24D0808 24D0808 24D0808 6 Replacement Igniter and Wire 1 10001297 10001297 10001297 10001297 10001297 10...

Страница 60: ...Valve Assembly 1 95E0101 95E0102 95E0101 95E0102 95E0101 95E0102 4 Pilot Assembly 1 95E0103 95D0104 95E0103 95E0104 95E0103 95E0104 5 Control Board 1 95E0100 95E0100 95E0100 95E0100 95E0100 95E0100 6...

Страница 61: ...tical Vent Termination Kits Vertical termination cap high wind includes storm collar SLP TVHW 0 12 6 12 roof flashing multi pack of 6 SLP RF6M 7 12 12 12 roof flashing multi pack of 6 SLP RF12M 3 12 t...

Страница 62: ...irestop 90 elbow 9 12 adjustable termination pipe SLP HVTK Rear vent termination includes adjustable termination cap 1 firestop multi pack of 4 SLP RVTM Horizontal vent termination kit includes adjust...

Страница 63: ...OCK SLP PART NO QTY BOX DESCRIPTION SLP DVFAM 4 SLP flex adapter kit w gear clamps multi pack of 4 SLPMP 8 SLP unit and inline pipe adapter to 4 x 7 Twist Lock carton of 8 MBSLP 8 VCG fireplace unit a...

Страница 64: ...o comply with the above requirements provided however that during said thirty 30 day period a battery operated carbon monoxide detector with an alarm shall be installed MASSACHUSETTS RESIDENTS ONLY 2...

Страница 65: ...Lifetime Warranty will also be void if the appliance is not operated and maintained according to the operating instructions supplied with the appliance and does not extend to 1 firebox burner assembly...

Страница 66: ...CFDV Series Gas Fireplace 66 20306739...

Страница 67: ...CFDV Series Gas Fireplace 20306739 67...

Страница 68: ...al Fireplace Institute NFI comme tant des sp cialistes du NFI en mati red appareils de chauffage au gaz 149 Cleveland Drive Paris Kentucky 40361 www vermontcastingsgroup com EFFICIENCY RATINGS MODEL E...

Отзывы: