CFDV Series Gas Fireplace
24
20306739
VENTING INSTALLATION
Step 5
Measure the horizontal length requirement including a 2"
(51 mm) overlap, i.e. from the elbow to the outside wall
face plus 2" (51 mm) (or the distance required if installing
a second 90° elbow).
Figure 44
Step 6
Use appropriate length of pipe sections – telescopic or
fixed – and install. The sections which go through the wall
are packaged with the starter kit, and can be cut to suit if
necessary.
Step 7
Guide the vent terminations 4" and 6
5
⁄
8
" collars into their
respective vent pipes. Double check that the vent pipes
overlap the collars by 2" (51 mm). Secure the termination
X
X
Figure 43 –
Vertical Height Requirements
X
X
FP1182
Figure 44 –
Horizontal Length Requirement
to the wall with screws provided and caulk around the wall
plate to weatherproof. As an alternative to screwing the
termination directly to the wall, you may also use expand-
ing plugs or an approved exterior construction adhesive.
Figure 42 –
Locate Vent Opening on Wall
NOTE
Always install vertical side wall horizontal
venting with a 1/4" rise for every 12" of run.
NOTE
Support horizontal pipes every 5' (152 cm)
with metal pipe straps.
Vent Opening for Combustible Walls
VO584-100
Vent Opening
2/99 djt
Fireplace Hearth
Framing Detail
Opening for Noncombustible Wall
7"
(190 mm)
Fireplace Hearth
9"
(244 mm)
9"
(244 mm)
KT1498
cap on sidingT
Cutout On Vinyl
Vinyl Siding Wall
Termination Cap
Figure 45 -
Horizontal Termination Cap on a Vinyl Siding Wall
Содержание 33CFDVNI
Страница 66: ...CFDV Series Gas Fireplace 66 20306739...
Страница 67: ...CFDV Series Gas Fireplace 20306739 67...