6
Slide the blue tab to unlock the rails and continue the sliding of the compute
node into the rack.
7
Secure the captive screws on the compute node ears.
Connecting the hardware to one compute node
This section provides cabling information for a Veritas 5350 Appliance that includes
one compute node, one Primary Storage Shelf, and up to three Expansion Storage
Shelves.
Each compute node is connected to the Primary Storage Shelf with four SAS-3
cables.
The compute nodes connect to each other with two Ethernet cables.
56
Hardware installation procedures
Connecting the hardware to one compute node
Содержание 5350
Страница 1: ...Veritas 5350 Appliance Hardware Installation Guide ...
Страница 13: ...The bottom drawer contains slots 42 through 83 13 Hardware overview 5U84 storage shelf drawers and disk drives ...
Страница 64: ...64 Hardware installation procedures Connecting the hardware to one compute node ...