3
Slide the blue tab forward to unlock the intermediate rail.
4
Pull the intermediate portion of rail the rail forward. Ensure that the ball bearing
retainer on the intermediate rail is locked forward.
Note:
You do not need to extend the rails as far as they can possibly extend.
You only need sufficient space to place the hardware into the rails.
5
Align the compute node inner rail to the intermediate rail in the rack. Slide the
inner rail that is attached to compute node forward into the intermediate rail
until a hard stop is encountered.
The rail has a lock mechanism that prevents the hardware from being fully
pushed into the rack.
55
Hardware installation procedures
Installing the compute node into a rack
Содержание 5350
Страница 1: ...Veritas 5350 Appliance Hardware Installation Guide ...
Страница 13: ...The bottom drawer contains slots 42 through 83 13 Hardware overview 5U84 storage shelf drawers and disk drives ...
Страница 64: ...64 Hardware installation procedures Connecting the hardware to one compute node ...