It is possible to already have one or more Expansion Storage Shelves, up to three
units. The cable scheme for NetBackup and Flex appliances is the same. The
hardware must be turned off before you add any storage shelves.
Turning off the existing hardware
You must turn off the existing system before you turn on any new Expansion shelves.
Be sure to perform these steps in the order that they are presented.
To turn off the existing hardware
1
Perform a soft shutdown of the compute nodes.
If you have two compute nodes you must shut them down separately.
■
From the NetBackup Appliance Shell Menu, enter
Support > Shutdown
.
From the Flex Appliance Shell, enter
system > shutdown
.
■
Verify that the compute node is completely turned off. All LEDs are off. Fans
are not running.
■
Repeat these steps for a second compute node if applicable.
2
After the compute nodes are turned off you must manually turn off the storage
shelves.
■
Turn off the Primary shelf first.
■
Then turn off the Expansion shelf.
■
If you have a second Expansion shelf turn it off last.
103
Adding Expansion Storage Shelves to an operating appliance that has at least one operating Expansion shelf
Turning off the existing hardware
Содержание 5350
Страница 1: ...Veritas 5350 Appliance Hardware Installation Guide ...
Страница 13: ...The bottom drawer contains slots 42 through 83 13 Hardware overview 5U84 storage shelf drawers and disk drives ...
Страница 64: ...64 Hardware installation procedures Connecting the hardware to one compute node ...