Connecting one Expansion Shelf to a system that
has one existing Expansion Shelf
Expansion Shelves connect to the Primary Shelf and to other Expansion Shelves
but they do not connect directly to the compute node.
To connect a new Expansion Shelf to a Primary Shelf and an existing
Expansion Shelf
1
Verify that all compute nodes and the Primary Shelf are off and that the power
cords are unplugged.
Do not remove the cables between the compute nodes and the Primary Shelf.
2
Obtain the two SAS-3 cables that ship with each Expansion Shelf.
3
Identify the single SAS-3 port on the left side of each controller module in the
Primary Shelf.
4
Identify ports A and C in each I/O module in the Expansion Shelf. Port B is not
available for use.
105
Adding Expansion Storage Shelves to an operating appliance that has at least one operating Expansion shelf
Connecting one Expansion Shelf to a system that has one existing Expansion Shelf
Содержание 5350
Страница 1: ...Veritas 5350 Appliance Hardware Installation Guide ...
Страница 13: ...The bottom drawer contains slots 42 through 83 13 Hardware overview 5U84 storage shelf drawers and disk drives ...
Страница 64: ...64 Hardware installation procedures Connecting the hardware to one compute node ...