■
Connect slot 7, Port 1 of the compute node to controller A, Port 0 on the
Primary Shelf.
Use the following procedure to connect Expansion Storage Shelves to the Primary
Shelf.
If you do not have any Expansion shelves at this time, proceed to the following
section to connect power cords to the hardware.
See
on page 74.
To connect Expansion Storage Shelves to a Primary Shelf
1
Do the following if you have one Expansion Shelf.
■
Connect one end of two SAS-3 cables to the SAS-3 port on the left hand
side of each RAID controller in the Primary Shelf.
The blue tab on the cable
must
face down in this port.
59
Hardware installation procedures
Connecting the hardware to one compute node
Содержание 5350
Страница 1: ...Veritas 5350 Appliance Hardware Installation Guide ...
Страница 13: ...The bottom drawer contains slots 42 through 83 13 Hardware overview 5U84 storage shelf drawers and disk drives ...
Страница 64: ...64 Hardware installation procedures Connecting the hardware to one compute node ...