7
Connect two power cords between the compute node and the PDU.
8
Verify that the final power cord cabling is consistent with the following diagram.
Turning on the hardware and verifying operation
You must turn on the hardware in the following order:
■
Expansion shelf
■
Primary shelf
77
Hardware installation procedures
Turning on the hardware and verifying operation
Содержание 5350
Страница 1: ...Veritas 5350 Appliance Hardware Installation Guide ...
Страница 13: ...The bottom drawer contains slots 42 through 83 13 Hardware overview 5U84 storage shelf drawers and disk drives ...
Страница 64: ...64 Hardware installation procedures Connecting the hardware to one compute node ...