13
Install the medium-sized clamping screws from the outside of the rack posts
so that they engage the rails and the rack.
The front of the rail requires one clamping screw in the center hole of the center
RU.
The rear of the rail requires two clamping screws. Insert these screws in the
middle hole in the first and the fifth RU.
14
Remove any plastic film from the front and sides of the shelf.
15
Remove the caps from both sides of the front of the storage shelf.
The caps snap off without any tools.
36
Hardware installation procedures
Installing a storage shelf
Содержание 5350
Страница 1: ...Veritas 5350 Appliance Hardware Installation Guide ...
Страница 13: ...The bottom drawer contains slots 42 through 83 13 Hardware overview 5U84 storage shelf drawers and disk drives ...
Страница 64: ...64 Hardware installation procedures Connecting the hardware to one compute node ...