5
Verify that the Power on (standby) LED on the front, left, of the shelf is green.
6
Turn on the Primary Storage Shelf.
■
Let the shelf initialize for 2 or 3 minutes.
■
Verify that the Power OK LEDs on the power supply modules are green.
■
Verify that the Power On LED on the control panel on the front of the shelf
is green.
80
Hardware installation procedures
Turning on the hardware and verifying operation
Содержание 5350
Страница 1: ...Veritas 5350 Appliance Hardware Installation Guide ...
Страница 13: ...The bottom drawer contains slots 42 through 83 13 Hardware overview 5U84 storage shelf drawers and disk drives ...
Страница 64: ...64 Hardware installation procedures Connecting the hardware to one compute node ...