42
Revision D November 2022
B. For Monorail Assembly (Figures 51)
Locate Monorail using the Monorail Assembly drawing. Drill anchor holes using
Monorail as a template. Anchor Monorail using the approved adhesive kits
provided. It is important to assemble each segment of Monorail in alignment from
the back to the front of the system (±1/4” [6 mm]).
Warning:
Every borehole and slot in Backup and Monorail must be anchored by
a stud using an approved adhesive.
Figure 51
Backup and Monorail Location for Tension Strut Backup
CONCRETE PAD
ANCHOR
BACKUP OR MONORAIL
WASHER
ROADWAY
NUT
CAUTION: 1.5” [40 mm]
MAXIMUM STUD HEIGHT
(TORQUE APPLIED)
Figure 52
Proper Stud Height
(Torque Applied)
Содержание QuadGuard HS
Страница 1: ......
Страница 59: ...Valtir com 58 Revision D November 2022 Notes...
Страница 60: ......