27
Revision D November 2022
C. For Monorail Deployment (Figures 19 and 20)
Locate Monorail using the Monorail Assembly drawing. Drill anchor holes using
Monorail as a template. Anchor Monorail using the approved adhesive kit provided.
It is important to attach each segment of Monorail in alignment from the back to
the front of the system (±
1/4” [6 mm]
).
Warning:
Every borehole and slot in Backup and Monorail must be anchored
by a stud using an approved adhesive.
Figure 19
Monorail Location for Concrete Backup
Figure 18
Backup and Monorail Location for Tension Strut Backup
CONCRETE PAD
CONCRETE PAD
ANCHOR
BACKUP OR MONORAIL
WASHER
ROADWAY
NUT
CAUTION: 40 MM [1.5”]
MAXIMUM STUD HEIGHT
(TORQUE APPLIED)
Figure 20
Proper Stud Height
(Torque Applied)
Содержание QuadGuard HS
Страница 1: ......
Страница 59: ...Valtir com 58 Revision D November 2022 Notes...
Страница 60: ......