Page 52
Next Program
The next program is the program that Sprint LC will link to if the product
passed the test as established in the previous program or programs. It is
important
not
to link a program to itself as an endless test loop results.
The next program line is on the main parameter menu.
See Figure 19 on page 49
If it is not desired to link to any other program, or if at the end of a linked
series of tests, set the next program to zero.
f
The next discussion is vacuum testing.
Figure 21
Back Prev Next Inc Dec
PROGRAM 2
Test Type VAC
Test Press. 10.000 psig
Press. Error .5 psig
Coupling GoTo
Test Params GoTo
Next Program 0
VACUUM DECAY TEST
Fill Time 2.0 sec
Stab Time 1.0 sec
Test Time 3.0 sec
Dump AUTO
Rej Level .050 psig
Product Vol. 1.0 cc
.51 ccm
Содержание SPRINT LC
Страница 1: ...SPRINT LC Uson MULTI AIR TESTER Owner s Guide ...
Страница 2: ......
Страница 10: ...Page 10 Back Component Layout FIGURE 4 8c 1 3 5 6 7 8 9 10 8a 8c 4 2 ...
Страница 190: ...Appendix 30 ...