xiv
Table of contents
Section 7 GAS PURGE
Section 8 TURBO MOLECULAR PUMP RECONDITION
8.1 Recommended maintenance intervals
……………………56
8.2 Turbo Molecular Pump Decontamination
……………………57
8.3 Bearing Replacement
………………………………………57
8.4 Check of the rotor blades
………………………………………57
8.5 Controller Replacement
………………………………………58
8.6 Turbo Molecular Pump Return Request
……………………59
Section 9 TROUBLESHOOTING
9.1 Vacuum Pressure Rise
………………………………………62
9.2 Abnormal Noise and/or Vibration
……………………………62
9.3 Nothing Happens After an Operation is Made
…………63
9.4 Power Failures
………………………………………………64
9.5 Alarm Detection Capabilities
……………………………65
9.5.1 Movement in Alarm Detection Capabilities (ALARM)
………65
9.5.2 Movement in Alarm Detection Capabilities (WARNING)
……65
9.5.3 Reset Procedure
………………………………………65
Содержание UTM300B
Страница 8: ...vii Location of label...
Страница 11: ...x This page is intentionally left blank...
Страница 17: ...xvi Table of contents This page is intentionally left blank...
Страница 30: ...CONSTRUCTION AND PRINCIPLE 3 1 Pump Construction 3 2 Principle of Turbo Molecular Pumping 3 3 Control system 3...
Страница 51: ...34 SECTION 5 INSTALLATION This page is intentionally left blank...
Страница 70: ...GAS PURGE 7...
Страница 77: ...60 SECTION 8 TURBO MOLECULAR PUMP RECONDITION This page is intentionally left blank...
Страница 111: ...A 26 Appendix A COMMUNICATIONS This page is intentionally left blank...
Страница 113: ...This page is intentionally left blank...