![Trox Technik FKR-EU Скачать руководство пользователя страница 97](http://html1.mh-extra.com/html/trox-technik/fkr-eu/fkr-eu_installation-and-operating-manual_1172495097.webp)
Solid wood wall/CLT wall, "flange to flange"
Fig. 73: Dry mortarless installation into a solid wood wall or CLT wall, with a fire batt, "flange to flange"
1
FKR-EU
2.4
Coated board system
3.11
Solid wood wall / CLT wall
4.1
Solid ceiling slab / solid floor
7.10
Trim panels (fire-resistant)
7.13a
Cladding, single-layer, fire-resistant
7.14
Reinforcing board of the same material as the
wall
Z
Spigot construction 370 mm
Flange construction 342 mm
s2
Spigot construction 40 – 600 mm
Flange construction 80 – 600 mm
*
Installation near the floor analogous to
#
optional
–
Up to EI 60 S
Additional requirements: dry mortarless installation
with fire batt in solid wood walls
Solid wood wall or CLT wall,
Fire batt systems, installation details, distances /
Suspension and fixing
Installation
Solid wood walls > Dry mortarless installation with fire batt
Fire damper FKR-EU
97
Содержание FKR-EU
Страница 162: ...Fire damper FKR EU 162 ...
Страница 163: ...Fire damper FKR EU 163 ...
Страница 164: ...Fire damper FKR EU 164 ...