Half-timbered construction "flange to flange"
Fig. 67: Dry mortarless installation into a half-timbered construction, with a fire batt, flange to flange, illustration
shows side by side installation (applies also to installation of dampers on top of each other)
1
FKR-EU
2.4
Coated board system
3.5
Half-timbered construction, cladding on both
sides
4.1
Solid ceiling slab / solid floor
6.8
Infill (cavities completely filled with mineral wool
≥
1000 °C,
≥
50 kg/m³, or bricks, aerated con-
crete, lightweight concrete, reinforced concrete
or clay)
7.9
Timber structure
7.11
Trim panels, double layer with staggered joints,
fire-resistant
7.13
Cladding
7.14
Reinforcing board of the same material as the
wall
Z
Spigot construction 370 mm
Flange construction 342 mm
s2
Spigot construction 40 – 600 mm
Flange construction 80 – 600 mm
*
Installation near the floor analogous to
Up to EI 60 S
EI 30 S
Installation
Lightweight partition walls with timber support ... > Dry mortarless installation with fire batt
Fire damper FKR-EU