187
(5) [rd] [… FF] will be displayed on the 7-segment display, and pump-down operation will start.
* To put the operation on hold midway, turn off the power supply to all the outdoor units, or press SW05 on the
interface P.C. board.
(6) Approx. 10 minutes after the system starts up, fully close the gas pipe service valve of the failed outdoor unit.
(7) Press SW04 of the failed outdoor unit to have pressure data (psi (MPa)) displayed.
(The display switches each time SW04 is pressed.)
Display Example
[Selection of outdoor unit for pressure adjustment]
(8) Of all outdoor units operating in the pump-down mode, select the one with the lowest unit No. as an outdoor
unit for pressure adjustment.
Identifying Unit No.
The unit No. is the number displayed on the 7-segment display when SW01/02/03 are set to 1/1/1.
([U#] [– – –]: # represents the unit No.)
[Setup of outdoor unit for pressure adjustment]
(9) Set SW01/02/03 on the interface P.C. board of the outdoor unit for pressure adjustment to 1/2/2.
(10)As the low-pressure sensor output is displayed on the 7-segment display, adjust the pressure to around
17 psi (0.12 MPa) by slowly closing the gas pipe service valve, with checking pressure data.
(11)Compare the low-pressure sensor outputs of the failed unit with that of the unit for pressure adjustment, and
wait until the two pressure readings become almost the same. After letting the system continue operating for
a while longer, fully close the gas pipe service valve of the unit for pressure adjustment.
(4) Set SW01/02/03 to 2/11/1.
[rd] [… … …] is displayed.
↓
Press SW04 and hold for 5 seconds or more.
(5) [rd] [ FF] is displayed (pump-down operation starts).
Behavior during pump-down operation
Outdoor unit
Behavior
Failed outdoor unit
Compressors: Turned off
Outdoor fan: On
PMV1, PMV2 and PMV4: Open
SV2/3A/3B/3C/3D/3E/3F: On
SV41/42/43/5/6: On
Every other outdoor unit
Operates in test cooling
operation mode
If oil has degraded due to
compressor fault, undo SV3A
valve connector.
Connect liquid pipe check joint and low
pressure-side check joint using charge
hose, and purge hose of air.
Fully close liquid pipe service valve.
(Leave service valves of gas and
balance pipes fully open.)
Header unit
Failed outdoor unit
Interface P.C. board of failed outdoor unit
Initial display
High-pressure sensor output
Low-pressure sensor output
Содержание MMY-MAP0724HT6UL
Страница 229: ...228 15Exploded Diagram Parts Price List SMMS i OUTDOOR UNIT MMY MAP0724HT6UL ...
Страница 230: ...229 MMY MAP0724HT6UL ...
Страница 232: ...231 SMMS i OUTDOOR UNIT MMY MAP0964HT6UL MMY MAP1144HT6UL ...
Страница 233: ...232 MMY MAP0964HT6UL MMY MAP1144HT6UL ...
Страница 237: ...236 SMMS i INV SERVICE PARTS LIST MMY MAP0724HT6UL 4 pieces PC board ...
Страница 238: ...237 SMMS i INV SERVICE PARTS LIST MMY MAP0964HT6UL MMY MAP1144HT6UL 4 pieces PC board ...
Страница 241: ...Copyright 2011 TOSHIBA CARRIER CORPORATION ALL Rights Reserved ...