![Toshiba e-studio 35 Скачать руководство пользователя страница 36](http://html.mh-extra.com/html/toshiba/e-studio-35/e-studio-35_operators-manual_425122036.webp)
1
1-16
About the Command WorkStation (Option)
Status bars
Jobs actively involved in the three processes (spooling, rasterizing, and printing) are
listed in the status bars that span the Queues window.
Status bars show the filename, file size, and user name for the active process, and an
indication of its progress. Each status bar heads the list of jobs that have completed the
process. Thus, beneath the Spool status bar, you see a list of spooled files; beneath the
RIP status bar, you see a list of rasterized (RIPped) files; beneath the Print status bar,
you see a list of jobs that have already been printed.
N
OTE
:
In the Spool status bar, the filename and user information always appear as
“Unknown” (as shown below). This information is not available until the job has
finished spooling to the GA-1040 disk.
When a job is being processed, provided animation is enabled (see page 2-4), the
corresponding status bar is animated, indicating that the process is active.
Spooled jobs on Hold (yellow)
Active spooled jobs (white)
RIPped jobs on Hold (yellow)
Active RIPped jobs (white)
Printed jobs (white); some include
raster data stored in RAM