
7
•
Maintenance and Service
Vanquish Diode Array Detectors (VH-D10) Operating Manual
Page 133
3. Carefully insert the flow cell into the flow cell opening in the
detector. The flow cell must sit completely in the opening.
Figure 29: Inserting the flow cell with opened rotating locks
4. Turn the rotating locks simultaneously clockwise until they are in a
vertical position. The flow cell is locked in place, when the rotating
locks arrest.
Figure 30: Closing the rotating locks
5. Check that the flow cell sits correctly in the flow cell opening. The
front of the flow cell should lie flush with the detector front panel.
6. Install the capillaries to the flow cell. Follow the instructions in
section 5.6.4 Flow Connections to the Flow Cell, page 67
7. When flow is established to the flow cell, you can open the shutter
in the light path before the flow cell.
8. Perform a wavelength validation (see
Содержание Vanquish VH-D10
Страница 4: ...Contacting Us Page 4 Vanquish Diode Array Detectors VH D10 Operating Manual...
Страница 44: ...4 Unpacking Page 44 Vanquish Diode Array Detectors VH D10 Operating Manual...
Страница 80: ...5 Installation Page 80 Vanquish Diode Array Detectors VH D10 Operating Manual...
Страница 110: ...6 Operation Page 110 Vanquish Diode Array Detectors VH D10 Operating Manual...
Страница 162: ...7 Maintenance and Service Page 162 Vanquish Diode Array Detectors VH D10 Operating Manual...
Страница 190: ...11 Appendix Page 190 Vanquish Diode Array Detectors VH D10 Operating Manual...
Страница 191: ...12 Index Vanquish Diode Array Detectors VH D10 Operating Manual Page 191 12 Index...
Страница 195: ...12 Index Vanquish Diode Array Detectors VH D10 Operating Manual Page 195...
Страница 196: ...Thermo Fisher Scientific Inc 168 Third Avenue Waltham Massachusetts 02451 USA www thermofisher com...