
Table of Content
Operations Manual
Bison 120
20-07-2018
Page 3
Revision 2.0
5.4 Removing Machine from the Low Loading Trailer ........................................5-14
(1) Tracking the Machine off the Transporter ................................................5-15
(2) Lifting Machine off the Trailer ...................................................................5-16
Initial Setup and Adjustments .................................................................. 6-2
6.2 Initial Inspection Check ..................................................................................6-3
6.3 Machine Location Considerations ..................................................................6-3
6.4 Measures Before Setup..................................................................................6-4
6.5 Measures After Long-Term Standstill .............................................................6-4
6.6 Pre-Operating checks .....................................................................................6-5
(1) Checking Engine Oil Level ........................................................................6-5
(2) Checking Diesel Level ...............................................................................6-6
(3) Checking Hydraulic Oil Level Check .........................................................6-7
(4) Checking Track Tension .............................................................................6-7
6.7 Setting Up the Machine ..................................................................................6-8
6.8 Setup ..............................................................................................................6-9
(1) Starting the Engine ....................................................................................6-9
(2) Placing the Extraction Belt Into Working Position ....................................6-11
(3) Setting the Crusher Discharge Opening ..................................................6-12
6.9 Introducing Material to Machine ...................................................................6-13
6.10 Initial Startup and Running In .......................................................................6-14
Standard Operating Procedures .............................................................. 7-2
7.2 Pre Operating Checks ....................................................................................7-3
7.3 Initial Startup ..................................................................................................7-4
7.4 Start Up ..........................................................................................................7-5
7.5 Manoeuvring ...................................................................................................7-8
(1) Tracking the Machine ................................................................................7-9
(2) Remote Tracking......................................................................................7-10
(3) Remote Tracking with Umbilical Cable ....................................................7-12
7.6 Standard Operation via Radio Remote ........................................................7-13
7.7 Shutdown .....................................................................................................7-15
7.9 Stalled Crusher Procedure ...........................................................................7-18
Emergency Operating Procedures ........................................................... 8-2
(1) Before Carrying Out Any Work on the Machine .........................................8-2
(2) After Carrying out Work on the Machine ....................................................8-4
Содержание Evoquip Bison 120
Страница 2: ...EvoQuip 200 Coalisland Road Dungannon Co Tyrone BT71 4DR Telephone 44 0 28 8774 0701...
Страница 23: ...Operations Manual Bison 120 20 07 2018 Page 2 7 Revision 2 0 Safety 2 Figure 2 1 Location of Safety Signs...
Страница 36: ...2 Safety Operations Manual Bison 120 20 07 2018 Page 2 20 Revision 2 0 Intentionally Left Blank...
Страница 42: ...3 Technical Data Operations Manual Bison 120 20 07 2018 Page 3 6 Revision 2 0 Intentionally Left Blank...
Страница 102: ...7 Standard Operating Procedures Operations Manual Bison 120 20 07 2018 Page 7 20 Revision 2 0 Intentioanlly Left Blank...
Страница 116: ...9 Maintenance Operations Manual Bison 120 20 07 2018 Page 9 8 Revision 2 0 Figure 9 2 Grease Points Cont...
Страница 196: ...10 Troubleshooting Operations Manual Bison 120 20 07 2018 Page 10 22 Revision 2 0 Intentionally Left Blank...
Страница 197: ...Storage 11 Operations Manual Bison 120 20 07 2018 Page 11 1 Revision 2 0 Table of Content 11 Storage 11 2...
Страница 204: ...Operations Manual Bison 120 20 07 2018 Page 12 6 Revision 2 0 12 Glossary of Terms Intentionally Left Blank...
Страница 206: ...Appendix Operations Manual Bison 120 20 07 2018 Page 13 2 Revision 2 0 Intentionally Left Blank...
Страница 208: ...Appendix A Operations Manual Bison 120 20 07 2018 Page A 2 Revision 2 0...
Страница 214: ...Appendix B Operations Manual Bison 120 20 07 2018 Page B 6 Revision 2 0 Intentionally Left Blank...
Страница 216: ...Appendix C Operations Manual Bison 120 20 07 2018 Page C 2 Revision 2 0 Intentionally Left Blank...
Страница 218: ...Appendix C Operations Manual Bison 120 20 07 2018 Page C 4 Revision 2 0 b Front Panel CPU Connection Cont...
Страница 219: ...Appendix C Operations Manual Bison 120 20 07 2018 Page C 5 Revision 2 0 c Main Wiring...
Страница 220: ...Appendix C Operations Manual Bison 120 20 07 2018 Page C 6 Revision 2 0 d Relay Box...
Страница 223: ......