
5 Transportation
Operations Manual
Bison 120
20-07-2018
Page 5-8
Revision 2.0
5.3 Loading the Machine for Transport
n
WARNING
Crush Hazard
Always wear appropriate personnel protective equipment.
NOTICE
Before transportation of the machine, check for loose or damaged components. Fasten all loose
parts, replace missing items or make repairs as found necessary to ensure that all components
are secured during transportation.
Securing the machine and any loose items to the low loader/ trailer is the responsibility of the
haulage contractor.
PROCEDURE
1. Before loading, the plant must be prepared for transportation, refer to putting the machine
into the transport position.
2. Check that the travelling dimensions and weight, when loaded, will be within the regulation
limits, refer to plant specification and information.
3. Make sure suitable ramps are positioned at the end of the trailer to load the machine.
4. Ensure all loose items are carefully stowed and secured if these are to be transported on
the plant.
5. Check that any loose items transported with the machine will not cause a hazard while loading.
6. Ensuring that the engine/motors are running at idle, load the machine slowly onto the trailer,
manoeuvring the machine with the tracks, using the umbilical control or the remote radio
control, if fitted.
7. Stop the machine.
(1) Prior to Haulage
PROCEDURE
1. Check for loose parts or debris on the machine.
2. Ensure all pins are secured with ‘R’ pins and Split pins.
3. Ensure persons transporting the machine adhere to all safety signs and procedures.
Содержание Evoquip Bison 120
Страница 2: ...EvoQuip 200 Coalisland Road Dungannon Co Tyrone BT71 4DR Telephone 44 0 28 8774 0701...
Страница 23: ...Operations Manual Bison 120 20 07 2018 Page 2 7 Revision 2 0 Safety 2 Figure 2 1 Location of Safety Signs...
Страница 36: ...2 Safety Operations Manual Bison 120 20 07 2018 Page 2 20 Revision 2 0 Intentionally Left Blank...
Страница 42: ...3 Technical Data Operations Manual Bison 120 20 07 2018 Page 3 6 Revision 2 0 Intentionally Left Blank...
Страница 102: ...7 Standard Operating Procedures Operations Manual Bison 120 20 07 2018 Page 7 20 Revision 2 0 Intentioanlly Left Blank...
Страница 116: ...9 Maintenance Operations Manual Bison 120 20 07 2018 Page 9 8 Revision 2 0 Figure 9 2 Grease Points Cont...
Страница 196: ...10 Troubleshooting Operations Manual Bison 120 20 07 2018 Page 10 22 Revision 2 0 Intentionally Left Blank...
Страница 197: ...Storage 11 Operations Manual Bison 120 20 07 2018 Page 11 1 Revision 2 0 Table of Content 11 Storage 11 2...
Страница 204: ...Operations Manual Bison 120 20 07 2018 Page 12 6 Revision 2 0 12 Glossary of Terms Intentionally Left Blank...
Страница 206: ...Appendix Operations Manual Bison 120 20 07 2018 Page 13 2 Revision 2 0 Intentionally Left Blank...
Страница 208: ...Appendix A Operations Manual Bison 120 20 07 2018 Page A 2 Revision 2 0...
Страница 214: ...Appendix B Operations Manual Bison 120 20 07 2018 Page B 6 Revision 2 0 Intentionally Left Blank...
Страница 216: ...Appendix C Operations Manual Bison 120 20 07 2018 Page C 2 Revision 2 0 Intentionally Left Blank...
Страница 218: ...Appendix C Operations Manual Bison 120 20 07 2018 Page C 4 Revision 2 0 b Front Panel CPU Connection Cont...
Страница 219: ...Appendix C Operations Manual Bison 120 20 07 2018 Page C 5 Revision 2 0 c Main Wiring...
Страница 220: ...Appendix C Operations Manual Bison 120 20 07 2018 Page C 6 Revision 2 0 d Relay Box...
Страница 223: ......