When the machine is completely shutdown for maintenance and repair work, it must be secured
against inadvertent starting by:
• Switching off the engine and removing the ignition key or isolating the electrical supply as
applicable.
• Implementing the lockout and tagout procedure.
• Attaching a warning sign(s) to the machinery in appropriate positions.
Carry out maintenance and repair work only if the machine is positioned on stable and level
ground and has been secured against inadvertent movement and buckling.
Never allow unqualified or untrained personnel to attempt to remove or replace any part of the
machine, or anyone to remove large or heavy components without adequate lifting equipment.
To avoid the risk of accidents, individual parts and large assemblies being moved for replacement
purposes should be carefully attached to lifting tackle and secured. Use only suitable and
technically adequate lifting gear. Never work or stand under suspended loads.
Keep away from the feed hoppers and stockpile conveyor discharge points, where there is risk
of serious injury or death due to the loading and removal of material.
Falling from and/or onto Evoquip machines can cause injury or even death. Do not climb on the
machine whilst it is in operation. Never use machine parts as a climbing aid.
Beware of moving haulage and loading equipment in the vicinity of the machine.
The fastening of loads and instructing of crane operators should be entrusted to experienced
persons only. The marshals giving the instructions must be within sight or sound of the operator.
After cleaning, examine all fuel, lubricant, and hydraulic fluid lines for leaks, loose connections,
chafe marks and damage. Any defects found must be rectified without delay.
Any safety devices removed for setup, maintenance or repair purposes must be refitted and
checked immediately upon completion of the maintenance and repair work to ensure full working
order.
Improperly disposing of waste can threaten the environment and ecology. Potentially harmful
waste used with EvoQuip equipment includes such items as oil, fuel, coolant, filters and batteries,
etc. Use leakproof containers when draining fluids. Do not use food or beverage containers
that may mislead someone into drinking from them. Do not pour waste onto the ground, down
a drain or into any water source. Ensure that all consumable’s and replaced parts are disposed
of safely and with minimum environmental impact.
Always ensure that any safety fitment such as locking wedges, securing chains, bars or struts
are utilized as indicated in these operating instructions.
Diesel fuel is highly flammable. Never remove the filler cap, or refuel, with the engine running.
Never add gasoline or any other fuels mixed to diesel because of increased fire or explosion
risks. Do not carry out maintenance on the fuel system near naked lights or sources of sparks,
such as welding equipment or whilst smoking.
After maintenance, tighten all bolts, fittings and connections. Install all guards, covers and shields.
Replace or repair any damaged ones. Refill and recharge pressure systems with recommended
fluids. Start the engine and check for leaks. Operate all controls and make sure the machine is
functioning properly. After testing, shut down, check the work you performed. Recheck all fluid
levels before releasing machine for operation.
Содержание Evoquip Bison 120
Страница 2: ...EvoQuip 200 Coalisland Road Dungannon Co Tyrone BT71 4DR Telephone 44 0 28 8774 0701...
Страница 23: ...Operations Manual Bison 120 20 07 2018 Page 2 7 Revision 2 0 Safety 2 Figure 2 1 Location of Safety Signs...
Страница 36: ...2 Safety Operations Manual Bison 120 20 07 2018 Page 2 20 Revision 2 0 Intentionally Left Blank...
Страница 42: ...3 Technical Data Operations Manual Bison 120 20 07 2018 Page 3 6 Revision 2 0 Intentionally Left Blank...
Страница 102: ...7 Standard Operating Procedures Operations Manual Bison 120 20 07 2018 Page 7 20 Revision 2 0 Intentioanlly Left Blank...
Страница 116: ...9 Maintenance Operations Manual Bison 120 20 07 2018 Page 9 8 Revision 2 0 Figure 9 2 Grease Points Cont...
Страница 196: ...10 Troubleshooting Operations Manual Bison 120 20 07 2018 Page 10 22 Revision 2 0 Intentionally Left Blank...
Страница 197: ...Storage 11 Operations Manual Bison 120 20 07 2018 Page 11 1 Revision 2 0 Table of Content 11 Storage 11 2...
Страница 204: ...Operations Manual Bison 120 20 07 2018 Page 12 6 Revision 2 0 12 Glossary of Terms Intentionally Left Blank...
Страница 206: ...Appendix Operations Manual Bison 120 20 07 2018 Page 13 2 Revision 2 0 Intentionally Left Blank...
Страница 208: ...Appendix A Operations Manual Bison 120 20 07 2018 Page A 2 Revision 2 0...
Страница 214: ...Appendix B Operations Manual Bison 120 20 07 2018 Page B 6 Revision 2 0 Intentionally Left Blank...
Страница 216: ...Appendix C Operations Manual Bison 120 20 07 2018 Page C 2 Revision 2 0 Intentionally Left Blank...
Страница 218: ...Appendix C Operations Manual Bison 120 20 07 2018 Page C 4 Revision 2 0 b Front Panel CPU Connection Cont...
Страница 219: ...Appendix C Operations Manual Bison 120 20 07 2018 Page C 5 Revision 2 0 c Main Wiring...
Страница 220: ...Appendix C Operations Manual Bison 120 20 07 2018 Page C 6 Revision 2 0 d Relay Box...
Страница 223: ......