
6 Initial Setup and Adjustments
Operations Manual
Bison 120
20-07-2018
Page 6-2
Revision 2.0
6
Initial Setup and Adjustments
NOTICE
When the machine is delivered, thoroughly check for any damage that has occurred during
transport. Do not set up the unit until the inspection is complete. Complete any delivery and
startup forms that were supplied with the equipment. Take note of any damage found, and photos
if possible, and have the driver initial your description of any problems.
Ensure all items shipped are present by checking all loose parts, small-parts boxes, and tools
against the packing list. Check in and around the machine for any loose items that have been
shipped inside the machine.
Terex recommends that the assembly and installation work of the machine is carried out by the
Terex customer service department. The manufacturer/supplier is not liable for damage caused
by improper assembly or installation.
The environment in which the machine operates contains inherent health and safety risks, which
the operator must take steps to avoid.
Dangers from overhead conveyor discharges, overspill material, vehicle movements, and other
site-related hazards must be anticipated.
Avoid these risks by carrying out risk assessments before the machine is put into operation. Ensure
that appropriate exclusion zone measures are put in place and site personnel safety awareness
training has been undertaken.
6.1 Assembly And Installation
n
WARNING
Observe all safety warnings while carrying out inspections and checks.
Wear personal protective equipment.
n
CAUTION
The environment in which the machine operates contains inherent health and safety risks, which
the operator must take steps to avoid.
Dangers from overhead conveyor discharges, over spill material, vehicle movements, and so on,
as well as other site-related hazards must be anticipated.
Avoid all by carrying out risk assessments before the machine is put into operation. Ensure that
appropriate exclusion zone measures are put in place and site personnel safety awareness
training has been undertaken.
NOTICE
Evoquip recommends that the assembly and installation work of the machine is carried out by
the Evoquip customer service department. The manufacturer/supplier is not liable for damage
caused by improper assembly or installation.
Refer to “Starting the Engine” for initial start-up of the engine.
Содержание Evoquip Bison 120
Страница 2: ...EvoQuip 200 Coalisland Road Dungannon Co Tyrone BT71 4DR Telephone 44 0 28 8774 0701...
Страница 23: ...Operations Manual Bison 120 20 07 2018 Page 2 7 Revision 2 0 Safety 2 Figure 2 1 Location of Safety Signs...
Страница 36: ...2 Safety Operations Manual Bison 120 20 07 2018 Page 2 20 Revision 2 0 Intentionally Left Blank...
Страница 42: ...3 Technical Data Operations Manual Bison 120 20 07 2018 Page 3 6 Revision 2 0 Intentionally Left Blank...
Страница 102: ...7 Standard Operating Procedures Operations Manual Bison 120 20 07 2018 Page 7 20 Revision 2 0 Intentioanlly Left Blank...
Страница 116: ...9 Maintenance Operations Manual Bison 120 20 07 2018 Page 9 8 Revision 2 0 Figure 9 2 Grease Points Cont...
Страница 196: ...10 Troubleshooting Operations Manual Bison 120 20 07 2018 Page 10 22 Revision 2 0 Intentionally Left Blank...
Страница 197: ...Storage 11 Operations Manual Bison 120 20 07 2018 Page 11 1 Revision 2 0 Table of Content 11 Storage 11 2...
Страница 204: ...Operations Manual Bison 120 20 07 2018 Page 12 6 Revision 2 0 12 Glossary of Terms Intentionally Left Blank...
Страница 206: ...Appendix Operations Manual Bison 120 20 07 2018 Page 13 2 Revision 2 0 Intentionally Left Blank...
Страница 208: ...Appendix A Operations Manual Bison 120 20 07 2018 Page A 2 Revision 2 0...
Страница 214: ...Appendix B Operations Manual Bison 120 20 07 2018 Page B 6 Revision 2 0 Intentionally Left Blank...
Страница 216: ...Appendix C Operations Manual Bison 120 20 07 2018 Page C 2 Revision 2 0 Intentionally Left Blank...
Страница 218: ...Appendix C Operations Manual Bison 120 20 07 2018 Page C 4 Revision 2 0 b Front Panel CPU Connection Cont...
Страница 219: ...Appendix C Operations Manual Bison 120 20 07 2018 Page C 5 Revision 2 0 c Main Wiring...
Страница 220: ...Appendix C Operations Manual Bison 120 20 07 2018 Page C 6 Revision 2 0 d Relay Box...
Страница 223: ......