Initial Setup and Adjustments 6
Operations Manual
Bison 120
20-07-2018
Page 6-3
Revision 2.0
6.2 Initial Inspection Check
n
WARNING
Observe all safety warnings while carrying out inspections and checks.
Wear personal protective equipment.
NOTICE
When the machine is delivered, thoroughly check for any damage that has occurred during
transport. Do not set up the unit until the inspection is complete. Complete any delivery and start-
up forms that were supplied with the equipment. Take note of any damage found, and photos if
possible, and have the driver initial your description of any problems.
Ensure all items shipped are present by checking all loose parts, small-parts boxes, and tools
against the packing list. Check in and around the machine for any loose items that have been
shipped inside the machine.
6.3 Machine Location Considerations
NOTICE
Prior to setting up the machine consideration should be given to a suitable layout to prevent
oversize material or metal from entering the chamber. In order to prevent bridging of the crusher,
no material above the size recommended should be fed into the machine.
The machine is designed so that when in transportation mode it can be set up and put to work
without the use of tools.
• Observe all safety warnings.
• Position the machine in a safe level operating position. Pay attention to access from the loading
area and to where material is deposited.
• Make sure that both tracks are in full contact with the ground minimizing movement of the
machine.
• Ensure the area under the tail drum of the discharge conveyor is clear of large stones, and so
on, which can cause belt damage.
• Regularly check the machine is level and stable.
• Pay attention to access from the loading area and to where material is deposited.
• For, dusty conditions some account must be taken of the prevailing wind direction to minimize
the possibility of dust entering the air intake.
• When setting up the machine, ensure that enough space is available around the machine to
enable easy set-up, servicing, and repair work.
• Machinery arranged before and after this machine has to be placed on the site accordingly
Содержание Evoquip Bison 120
Страница 2: ...EvoQuip 200 Coalisland Road Dungannon Co Tyrone BT71 4DR Telephone 44 0 28 8774 0701...
Страница 23: ...Operations Manual Bison 120 20 07 2018 Page 2 7 Revision 2 0 Safety 2 Figure 2 1 Location of Safety Signs...
Страница 36: ...2 Safety Operations Manual Bison 120 20 07 2018 Page 2 20 Revision 2 0 Intentionally Left Blank...
Страница 42: ...3 Technical Data Operations Manual Bison 120 20 07 2018 Page 3 6 Revision 2 0 Intentionally Left Blank...
Страница 102: ...7 Standard Operating Procedures Operations Manual Bison 120 20 07 2018 Page 7 20 Revision 2 0 Intentioanlly Left Blank...
Страница 116: ...9 Maintenance Operations Manual Bison 120 20 07 2018 Page 9 8 Revision 2 0 Figure 9 2 Grease Points Cont...
Страница 196: ...10 Troubleshooting Operations Manual Bison 120 20 07 2018 Page 10 22 Revision 2 0 Intentionally Left Blank...
Страница 197: ...Storage 11 Operations Manual Bison 120 20 07 2018 Page 11 1 Revision 2 0 Table of Content 11 Storage 11 2...
Страница 204: ...Operations Manual Bison 120 20 07 2018 Page 12 6 Revision 2 0 12 Glossary of Terms Intentionally Left Blank...
Страница 206: ...Appendix Operations Manual Bison 120 20 07 2018 Page 13 2 Revision 2 0 Intentionally Left Blank...
Страница 208: ...Appendix A Operations Manual Bison 120 20 07 2018 Page A 2 Revision 2 0...
Страница 214: ...Appendix B Operations Manual Bison 120 20 07 2018 Page B 6 Revision 2 0 Intentionally Left Blank...
Страница 216: ...Appendix C Operations Manual Bison 120 20 07 2018 Page C 2 Revision 2 0 Intentionally Left Blank...
Страница 218: ...Appendix C Operations Manual Bison 120 20 07 2018 Page C 4 Revision 2 0 b Front Panel CPU Connection Cont...
Страница 219: ...Appendix C Operations Manual Bison 120 20 07 2018 Page C 5 Revision 2 0 c Main Wiring...
Страница 220: ...Appendix C Operations Manual Bison 120 20 07 2018 Page C 6 Revision 2 0 d Relay Box...
Страница 223: ......