TR5-Lite User Manual
81
June 20, 2018
Demonstration Setup
Make sure Quartus II and Nios II are installed on your PC.
Power on the TR5-Lite board.
Use USB Blaster to connect PC and the TR5-Lite board and install USB Blaster driver if
necessary.
Execute the demo batch file “
test.bat
”(or “
test_ub2.bat
” for USB-Blaster II) under the batch file
folder,
Nios_DDR3\demo_batch\DDR3_A_667MHZ
or
Nios_DDR3\demo_batch\DDR3_B_667MHZ
After Nios II program is downloaded and executed successfully, a prompt message will be
displayed in nios2-terminal.
Press
Button1~Button0
of the TR5-Lite board to start SDRAM verify process. Press
Button0
for continued test and press any to terminate the continued test
.
The program will display progressing and result information, as shown in
Figure 6-4
Display Progress and Result Information for the DDR3 Demonstration
Содержание TR-5 Lite FPGA
Страница 1: ...TR5 Lite User Manual 1 www terasic com June 20 2018...
Страница 71: ...TR5 Lite User Manual 71 www terasic com June 20 2018 Figure 5 9 CDCM 61004 Demo Figure 5 10 Si570 Demo...
Страница 85: ...TR5 Lite User Manual 85 www terasic com June 20 2018 Figure 7 5 Transceiver Loopback Test in Progress...