85
Figure 3-18 P_Protect tab
3. Connect the load to the DC power under test when the power is OFF.
4. Set a sink current in CC mode of the load.
5. Turn on the power output and the load input. Delay a period of time,
the overpower protection of the load will occur.
6. Close all instruments and finish the test.