
38
Figure 2-32 OPPT Test Function
Operating Steps
1. Connect device
Power on the instrument, connect the DUT and the channel input
terminals of the electronic load, as shown in Figure 2-2.
2. Set running parameters
Press the Shift + CV key on the front panel , select “OPPT” then enter
OPPT test operation, as shown in 2-33, 2-34, 2-35.