
ADFM® Flow Meter
Section 2 Setup and Installation
2-52
4. Place the four batteries inside the compartment with the
terminals facing downward.
Figure 2-56 Box: Battery compartment
5. Replace the housing lid, installing it so that the metal
screw tab in the chassis is over the cutout in the upper
right corner of the lid, as before.
Figure 2-57 Reinstalling the battery compartment lid
Cutout in lid
Screw tab
Содержание ADFM Hot Tap
Страница 2: ......
Страница 4: ......
Страница 20: ...ADFM Flow Meter Section 1 Introduction 1 10 ...
Страница 85: ...ADFM Flow Meter Section 2 Setup and Installation 2 65 Figure 2 73 Viewing data in Expert View ...
Страница 86: ...ADFM Flow Meter Section 2 Setup and Installation 2 66 ...
Страница 98: ...ADFM Flow Meter Section 3 Maintenance and Troubleshooting 3 12 ...
Страница 114: ......
Страница 116: ......