![Tektronix LTA7P Series Скачать руководство пользователя страница 98](http://html1.mh-extra.com/html/tektronix/lta7p-series/lta7p-series_service-manual_1078035098.webp)
Adjustment/Verification Fixture Adjustment
5- 12
TLA7Nx, TLA7Px, & TLA7Qx Logic Analyzer Module Service Manual
The following procedure checks the DC power supply. Refer to Figure 5--3 for
test point locations.
Parameter tested
Power supply
Equipment
Required
DMM with test leads (item 9)
Prerequisites
Warm-up time: 30 minutes for adjustment/verification fixture and test
equipment
2.
Connect the DMM (--) lead to J8 (V
EE
).
3.
Connect the DMM (+) lead to J10 (V
DD
) and check for a voltage reading of
+5 V
±
0.10 V.
4.
Connect the DMM negative (--) lead to J9 (GND).
5.
Connect the DMM positive (+) lead to J10 (V
DD
) and adjust R38 for a
voltage reading of +2.00 V
±
10 mV.
Power Supply Checks
Содержание LTA7P Series
Страница 4: ......
Страница 14: ...Service Safety Summary x TLA7Nx TLA7Px TLA7Qx Logic Analyzer Module Service Manual...
Страница 22: ...Introduction xviii TLA7Nx TLA7Px TLA7Qx Logic Analyzer Module Service Manual...
Страница 86: ......
Страница 96: ...Logic Analyzer Module Adjustment Procedures 5 10 TLA7Nx TLA7Px TLA7Qx Logic Analyzer Module Service Manual...
Страница 148: ...Troubleshooting 6 40 TLA7Nx TLA7Px TLA7Qx Logic Analyzer Module Service Manual...
Страница 154: ...Electrical Parts List 8 2 TLA7Nx TLA7Px TLA7Qx Logic Analyzer Module Service Manual...
Страница 170: ...Mechanical Parts List 10 14 TLA7Nx TLA7Px TLA7Qx Logic Analyzer Module Service Manual...
Страница 171: ......
Страница 172: ......