Theory o f Operation—2445 Service
As the Prereguiator power supply turns on, capacitor
C l034 charges from the +5-V reference level toward
ground potential through R1034 and R1037. As it does,
the voltage at pin 4 (one input o f Dead-Time Comparator
U1) w ill pass through the positive-peak value of the t r i
angular waveform on the other input of the Dead-Time
Comparator. The comparator w ill then begin outputting
narrow pulses that become progressively wider as the
voltage on pin 4 settles to zero volts. These pulses drive
switching transistor Q1050, and their slow progression from
narrow to wide causes the various secondary supplies to
gradually build up to their final operating levels. The slow
buildup prevents a turn-on current surge that would cause
the current-lim it circuitry to shut down the supply.
During the startup, capacitor Cl 072 acts as a substantia!
load, and a relatively large current w ill flow in the windings
o f T1050 for the first few cycles of Preregulator switching.
These strong current pulses ensure that storage capacitor
C l066 becomes charged sufficiently to start the Inverter
Drive circuit. Once the Inverter Drive stage is operating,
the normal switching current through T1050 maintains
the required charge on C1066. (The Inverter Drive power
supply is discussed later in this description.)
Dead-Time Comparator U1 is referenced at approxi
mately 0.1 V above the ground level at pin 4 (established
when C1034 becomes fu lly charged) and outputs a narrow.
3-42
Figure 3-12. Simplified schematic of control network.
Содержание 2445
Страница 1: ...Tektronix 2445 OSCILLOSCOPE SERVICE INSTRUCTION MANUAL ...
Страница 11: ...2445 Service 3829 01 The 2445 Oscilloscope ...
Страница 44: ...Theory of Operation 2445 Service 3831 10A Figure 3 1 Block diagram ...
Страница 45: ...Theory of Operation 2445 Service 3831 10B Figure 3 1 Block diagram cont 3 3 ...
Страница 210: ...3829 58 Figure 9 4 2445 block diagram ...
Страница 214: ......
Страница 217: ......
Страница 219: ...2445 382 72 ...
Страница 222: ...2445 ...
Страница 231: ...A 1 t C t t F t G t H t ...
Страница 233: ......
Страница 236: ......
Страница 238: ...2445 392 1 75 ...
Страница 244: ......
Страница 247: ...A 1 C _____ D E F G H J 2445 3811 74 ...
Страница 248: ...1 2 3 4 5 6 7 8 9 i o 2445 DISPLAY SEQUENCER TRIG GERING A4B SWEEPS ...
Страница 253: ......
Страница 263: ... 0 2445 J8 i S ...
Страница 264: ...1 2 3 4 5 6 7 i 8 I i 9 10 2445 READOUT ...
Страница 275: ......
Страница 278: ......
Страница 281: ......
Страница 283: ... 8VJNR EG 3S 5 fROM P232 5 10 A 15VUNREG 8S F R O Mn i 2445 3 0 2 S 8 I ...
Страница 286: ...2445 3823 82 ...
Страница 290: ...B H le w o q 87V T S o I R v n i U1 R1873 PARTIAL A9 HIGH VOLTAGE BOARD 2445 ...
Страница 299: ...2445 Service DAC REF A5 CONTROL ADJUSTMENT LOCATIONS 3 ...
Страница 300: ......
Страница 301: ...J119 O A A Z fio rv ic A J118 VERT READOUT JITTER R618 i x n n t o i n R801 X10 GAIN R850 3829 71 ...
Страница 304: ...2 R E TU R N T O 1 ...
Страница 305: ...ERROR MESSAGE DIAGNOSTICS ...
Страница 306: ...ERROR MESSAGE DIAGNOSTICS ...
Страница 307: ...O A A C t rnra g i tiw c t 3829 89 ...
Страница 308: ...RETURN TO ...
Страница 309: ...FRONT PANEL TROUBLESHOOTING ...
Страница 310: ...FRONT PANEL TROUBLESHOOTING ...
Страница 311: ...2445 Service 3829 90 ...
Страница 316: ...R E TU R N T O v 1 y ...
Страница 317: ...SWEEP TROUBLESHOOTING PROCEDURE ...
Страница 318: ...2445 Service NOTE 3 56V IS M E A S U R E D A S 1 44V W ITH R ESPEC T TO TH E 5V SUPPLY 3829 95 ...
Страница 323: ......
Страница 324: ...2445 Service 3829 85 ...
Страница 325: ......
Страница 326: ... KERNEL NOP DIAGNOSTIC PROCEDURE ...
Страница 327: ...10 POWER SUPPLY TROUBLESHOOTING PROCEDURE 3829 94 ...
Страница 330: ......
Страница 334: ...2445 Service REGULATOR TROUBLESHOOTING PROCEDURE 3829 93 ...
Страница 338: ......
Страница 346: ...12 2445 SERVICE ...
Страница 347: ...2445 SERVICE ...
Страница 348: ...2445 SERVICE ...