![background image](http://html1.mh-extra.com/html/team-losi/bk2/bk2_owners-manual_4004840008.webp)
4
BAG B (Continued)
Step B-4
Step B-5
Figure 11
*NOTE: If the 3/16" x 3/8" Bearing only has one Teflon
seal
(colored, woven-looking) in it, position the bearing so that the seal
faces the outside of the Spindle.
q
1. Insert a 3/16" x 3/8" sealed Bearing (27) into each side of both
front Spindles [left (28), right (29)].
q
2. Insert a front Stub Axle (30) from the outside of both Spindles as
shown in Figure 10.
q
3. Place a front Axle Spacer (31) over each of the two front Stub
Axles as shown in Figure 10. Thread a 4-40 x 1" Button Head Screw
(32) into each of the Stub Axles from the back side. The front Axle
Spacer should be positioned on the Stub Axle between the head of
the Screw and the inner sealed Bearing. Tighten the Screws while
holding the Stub Axle with a 3/8" socket wrench or pliers.
Be sure that the front Axle Screws are
TIGHT
! The thread-lock
compound that is on the Screws takes 24 hours to cure.
q
1. Attach the left Spindle (28) to the left Spindle Carrier (33)
by
aligning the holes in each part and inserting a 3/32" x 1.050" Hinge Pin
(35) from the bottom. Do not insert the Pin all the way through both
parts yet.
q
2. Insert a front Spindle Spacer (36) between the top of the Spindle
and the Spindle Carrier as shown in Figure 11. Once the Spacer is in
place, insert the Hinge Pin through the Spacer and the top of the
Spindle Carrier. Center the Hinge Pin in the Spindle Carrier.
IMPORTANT NOTE:
There are two different sizes of E-clips in
this assembly bag. Be sure to use the smallest E-clips on the 3/32"
Hinge Pins. Refer to Figure 11 and make sure that the Spindles are
installed correctly.
q
3. Secure the Hinge Pin with two 3/32" E-clips (37), one on each
end.
q
4. Repeat Steps 1-3 for the right Spindle (29) and right Spindle
Carrier (34).
Figure 10
27
31
32
36
37
Front Spindle Assembly:
Front Spindle to Spindle Carrier:
33
35
28
36
37
32
31
28
30
27
35