94
P
RODUCT
M
ANUAL
1019786
C
HAPTER
7—S
YSTEM
M
AINTENANCE
LCD D
IAGNOSTIC
T
EST
S
EQUENCE
The test begins with dock 1 then moves sequentially through each dock,
ending with dock 8.
The LCD diagnostic test sequence is as follows:
1.
At dock 1, the LCD panel pixels all turn off, then all turn on.
2.
The dock’s power LED/eject button alternately flashes amber and green. If
a cartridge is loaded in the dock, the cartridge’s activity LED also alternately
flashes amber and green.
3.
The dock’s LCD panel backlight flashes, then turns off.
4.
The test moves to the next dock, completing the same sequence described
in steps 1 through 3 for each subsequent dock.
5.
When the LCD test for each dock has completed, the error indicator and the
USB indicator flash on the LED center panel.
6.
All eight dock LCD panels flash "DONE" when the test is complete.
Dock 8
Dock 1
Dock 2
Dock 3
Dock 4
Dock 5
Dock 6
Dock 7
LED
Center
Panel
Содержание RDX QuikStation
Страница 1: ......
Страница 4: ...IV PRODUCT MANUAL 1019786 NOTES...
Страница 18: ...8 PRODUCT MANUAL 1019786 CHAPTER 1 PRODUCT OVERVIEW...
Страница 56: ...46 PRODUCT MANUAL 1019786 CHAPTER 3 ISCSI CONFIGURATION...
Страница 91: ...OCTOBER 2011 RDX QUIKSTATION 81 NOTES...
Страница 92: ...82 PRODUCT MANUAL 1019786 CHAPTER 5 LOGICAL DEVICE MANAGEMENT...
Страница 99: ...OCTOBER 2011 RDX QUIKSTATION 89 cloning job status bar...
Страница 100: ...90 PRODUCT MANUAL 1019786 CHAPTER 6 PHYSICAL DEVICE MANAGEMENT NOTES...
Страница 112: ...102 PRODUCT MANUAL 1019786 CHAPTER 7 SYSTEM MAINTENANCE NOTES...
Страница 120: ...110 PRODUCT MANUAL 1019786 APPENDIX CHAPTER B SPECIFICATIONS NOTES...
Страница 130: ...120 PRODUCT MANUAL 1019786 INDEX Notes...