3-78 ENGINE
ENGINE REASSEMBLY
• Reassemble the engine in the reverse order of disassembly.
• The following steps require special attention or precautionary
measures should be taken.
NOTE:
Apply engine oil to each running and sliding part before reas-
sembling.
CRANKSHAFT
• Install the crankshaft assembly to the upper crankcase.
• Apply a MOLYBDENUM OIL SOLUTION to each crankshaft
journal and bearing lightly.
(
MOLYBDENUM OIL SOLUTION
• Insert the thrust bearing with oil groove
A
facing the crank
web.
BALANCER SHAFT
• Install the balancer shaft on the upper crankcase.
NOTE:
Align the C-ring with the groove of bearing and the bearing pin
with the indent on the bearing.
• Set the balancer shaft so that its punch mark
A
is aligned
with the punch mark
B
on the crankshaft.
Содержание VZR1800 2007
Страница 1: ...VZR1800...
Страница 3: ......
Страница 51: ...2 30 PERIODIC MAINTENANCE...
Страница 57: ...White Page...
Страница 116: ...ENGINE 3 59 TRANSMISSION PARTS LOCATION 1 Countershaft 2 Driveshaft...
Страница 171: ...White Page...
Страница 201: ...White Page...
Страница 357: ...White Page...
Страница 405: ...9 48 CHASSIS Apply SUZUKI SUPER GREASE A to the spacers 99000 25010 SUZUKI SUPER GREASE A or equivalent...
Страница 479: ...White Page...
Страница 533: ...White Page...
Страница 561: ......
Страница 587: ......