CHASSIS 9-13
WHEEL
• Install the collar
1
in the left side.
• Install the front wheel with the front axle and tighten the front
axle with hand temporarily.
)
FRONT AXLE
• Tighten the front axle to the specified torque.
%
09900-18740: Hexagon socket (24 mm)
#
Front axle bolt: 100 N·m (10.0 kgf-m, 72.5 lb-ft)
BRAKE CALIPER
• Tighten the brake caliper mounting bolts, left and right to the
specified torque.
#
Front brake caliper mounting bolt:
39 N·m (3.9 kgf-m, 28.0 lb-ft)
• Move the front fork up and down 4 or 5 times.
• Tighten two axle pinch bolts on the right front fork leg to the
specified torque.
#
Front axle pinch bolt: 23 N·m (2.3 kgf-m, 16.5 lb-ft)
NOTE:
After remounting the front wheel, pump the brake lever a few
times to check for proper brake operation.
The directional arrow on the tire should point to the
wheel rotation, when remounting the wheel.
Содержание VZR1800 2007
Страница 1: ...VZR1800...
Страница 3: ......
Страница 51: ...2 30 PERIODIC MAINTENANCE...
Страница 57: ...White Page...
Страница 116: ...ENGINE 3 59 TRANSMISSION PARTS LOCATION 1 Countershaft 2 Driveshaft...
Страница 171: ...White Page...
Страница 201: ...White Page...
Страница 357: ...White Page...
Страница 405: ...9 48 CHASSIS Apply SUZUKI SUPER GREASE A to the spacers 99000 25010 SUZUKI SUPER GREASE A or equivalent...
Страница 479: ...White Page...
Страница 533: ...White Page...
Страница 561: ......
Страница 587: ......