![Suzuki VZR1800 2007 Скачать руководство пользователя страница 324](http://html1.mh-extra.com/html/suzuki/vzr1800-2007/vzr1800-2007_service-manual_1408730324.webp)
FUEL SYSTEM AND THROTTLE BODY 6-23
FUEL INJECTOR INSTALLATION
• Apply thin coat of the engine oil to new injector cushion seals
and O-rings. (
!
6-20)
• Install the injector by pushing it straight to the throttle body.
Never turn the injector while pushing it. (
!
6-20)
THROTTLE VALVE SYNCHRONIZATION
Check and adjust the throttle valve synchronization among two
cylinders.
Step 1
• Remove the fuel tank. (
!
6-3)
• Remove the ISC valve. (
!
6-18)
• Connect the ISC valve coupler
1
and hoses
2
.
• Connect the special tool (Mode select switch) to the dealer
mode coupler. (
!
5-18)
• Disconnect the vacuum hoses
3
from each throttle body.
• Connect the vacuum tester hoses
4
to each vacuum nipple
on the throttle body.
#1
#2
#1
#2
Содержание VZR1800 2007
Страница 1: ...VZR1800...
Страница 3: ......
Страница 51: ...2 30 PERIODIC MAINTENANCE...
Страница 57: ...White Page...
Страница 116: ...ENGINE 3 59 TRANSMISSION PARTS LOCATION 1 Countershaft 2 Driveshaft...
Страница 171: ...White Page...
Страница 201: ...White Page...
Страница 357: ...White Page...
Страница 405: ...9 48 CHASSIS Apply SUZUKI SUPER GREASE A to the spacers 99000 25010 SUZUKI SUPER GREASE A or equivalent...
Страница 479: ...White Page...
Страница 533: ...White Page...
Страница 561: ......
Страница 587: ......