Chapter 8
Power Subsystem
8-9
6. Press down firmly to ensure the connector at the base of the board is firmly mated
with the receptacle on the baseplane.
FIGURE 8-7
Inserting the Power Distribution Board
7. Move the ejector lever to the horizontal position (
).
8. Re-engage the power supplies.
9. Install the IB_SSC assembly.
See
Section 10.1.2, “Installing the IB_SSC Assembly” on page 10-7
10. Remove the wrist strap.
11. Slide the system into the system cabinet.
See
Section 3.2, “Sliding the System Into the System Cabinet” on page 3-5
12. Retract the system cabinet stabilization bar.
13. Replace the four power input cables, AC0 through AC4 (
14. Power on the system.
See
Section 4.1, “Powering On the System” on page 4-1
Connector
Receptacle
Содержание 817-4054-15
Страница 14: ...xiv Sun Fire E2900 System Service Manual May 2006 ...
Страница 36: ...1 16 Sun Fire E2900 System Service Manual May 2006 ...
Страница 64: ...3 16 Sun Fire E2900 System Service Manual May 2006 ...
Страница 86: ...5 18 Sun Fire E2900 System Service Manual May 2006 ...
Страница 124: ...7 16 Sun Fire E2900 System Service Manual May 2006 ...
Страница 134: ...8 10 Sun Fire E2900 System Service Manual May 2006 ...
Страница 164: ...10 14 Sun Fire E2900 System Service Manual May 2006 ...
Страница 170: ...11 6 Sun Fire E2900 System Service Manual May 2006 ...