12-4
Sun Fire E2900 System Service Manual • May 2006
11. Loosen the two captive screws securing the indicator board to the top of the
chassis (
12. Remove the module and place it on an ESD mat (
12.1.2
Installing the System Indicator Board
Caution –
Use proper ESD grounding techniques when handling components. Wear
an antistatic wrist strap and use an ESD-protected mat. Store ESD-sensitive
components in its ESD safe packaging box before placing them on any surface.
1. Attach a wrist strap. Place a grounded ESD mat close to the system.
See to
Section 2.8, “Antistatic Precautions” on page 2-6
2. Secure the indicator board using the two captive screws (
3. Connect the indicator board connector to the receptacle at the top of the fan tray.
Replace the retaining clip (
).
4. Push hard on the back of the system indicator board housing onto the chassis
until the plastic latching clips engage (
).
This action connects the upper housing to the lower housing.
5. Close the front doors to the system.
6. Retract the system cabinet stabilization bar.
7. Remove the wrist strap.
8. Replace the four input power cables, AC0 through AC4 (
and
9. Power on the system.
See
Содержание 817-4054-15
Страница 14: ...xiv Sun Fire E2900 System Service Manual May 2006 ...
Страница 36: ...1 16 Sun Fire E2900 System Service Manual May 2006 ...
Страница 64: ...3 16 Sun Fire E2900 System Service Manual May 2006 ...
Страница 86: ...5 18 Sun Fire E2900 System Service Manual May 2006 ...
Страница 124: ...7 16 Sun Fire E2900 System Service Manual May 2006 ...
Страница 134: ...8 10 Sun Fire E2900 System Service Manual May 2006 ...
Страница 164: ...10 14 Sun Fire E2900 System Service Manual May 2006 ...
Страница 170: ...11 6 Sun Fire E2900 System Service Manual May 2006 ...