4-1
C H A P T E R
4
Powering On and Off
This chapter explains how to power the system on and take the system to Standby
mode. This chapter includes the following topics:
■
Section 4.1, “Powering On the System” on page 4-1
■
Section 4.2, “Taking the System to Standby Mode” on page 4-2
■
Section 4.3, “Using the On/Standby Switch” on page 4-3
4.1
Powering On the System
1. Make sure that a minimum of two power supplies are installed and powered on.
2. Make sure that all power cables are connected and external circuit breakers are
switched on.
3. Power on the system from Standby mode with
one
of the following steps.
■
Press and release the On/Standby switch to the right—On position.
OR
■
Type the
poweron
command at the
lom>
prompt.
Refer to the system administration manual and the system controller manual for
this product.
4. After a delay, which depends on the POST level set and the number of boards in
the system, the following activities occur:
■
The system active (
) LED is lit.
■
The system executes the power-on self-test (POST).
Then, the system is completely powered on.
Содержание 817-4054-15
Страница 14: ...xiv Sun Fire E2900 System Service Manual May 2006 ...
Страница 36: ...1 16 Sun Fire E2900 System Service Manual May 2006 ...
Страница 64: ...3 16 Sun Fire E2900 System Service Manual May 2006 ...
Страница 86: ...5 18 Sun Fire E2900 System Service Manual May 2006 ...
Страница 124: ...7 16 Sun Fire E2900 System Service Manual May 2006 ...
Страница 134: ...8 10 Sun Fire E2900 System Service Manual May 2006 ...
Страница 164: ...10 14 Sun Fire E2900 System Service Manual May 2006 ...
Страница 170: ...11 6 Sun Fire E2900 System Service Manual May 2006 ...