9-6
Sun Fire E2900 System Service Manual • May 2006
9. Raise the ejector levers simultaneously until they are 90 degrees straight out from
the board (
).
This action unseats the board from the baseplane connector.
FIGURE 9-4
Raising the CPU/Memory Board Ejector Levers
10. Grasp the ejector levers and pull upward to raise the CPU/Memory board until the
green panels are visible.
The antigravity clutch holds the board in position so that it can be released without
the board sliding down into the system.
Note –
Any green part is a part that you can touch.
11. Grasp the green panels and raise the CPU/Memory board out of the system
(
)
.
12. Place the board in its ESD safe packaging box on a grounded ESD mat.
Содержание 817-4054-15
Страница 14: ...xiv Sun Fire E2900 System Service Manual May 2006 ...
Страница 36: ...1 16 Sun Fire E2900 System Service Manual May 2006 ...
Страница 64: ...3 16 Sun Fire E2900 System Service Manual May 2006 ...
Страница 86: ...5 18 Sun Fire E2900 System Service Manual May 2006 ...
Страница 124: ...7 16 Sun Fire E2900 System Service Manual May 2006 ...
Страница 134: ...8 10 Sun Fire E2900 System Service Manual May 2006 ...
Страница 164: ...10 14 Sun Fire E2900 System Service Manual May 2006 ...
Страница 170: ...11 6 Sun Fire E2900 System Service Manual May 2006 ...