Midilift SL
Installation Guide
October 2016
Version 9
43
13.2 Landing stations (fire clad)
Position call stations so that the centre of the call button is between 900 and 1100mm from
the finished floor.
Fit back box using 2 large
self drilling screws
Fit call station & emergency
release tube after plasterboard
has been fitted
Drill
∅
20 hole through
back box and corner
upright, fit rubber gland
Button centre to FFL to
be 900-1100mm.