Midilift SL
Installation Guide
October 2016
Version 9
52
18 COVERS & INFILL PANELS
18.1 Upper Level Gate
Working from the bottom of the structure, fit the corner upright infill panels.
Working from the top of the structure, fit the guide infill panels. The top panel should be flush
with the top of the horizontal member.
Fit the guide top infill plate & corner upright caps.
Note:
Use a low torque setting when fixing into the aluminium guides with self drill screws to
avoid stripping the thread.
Top panel flush with top
of horizontal member
50mm Bottom of lowest panel to pit floor.
Upright Infill Angles
(fit first)
Guide Infill Panels
(fit second)
Guide Top Infill Plate
(fit third)
Corner Upright Cap
(fit last)
Self Drill Screw
Plastic Cap
Dome Hd Rivet
View on Arrow 'A'
A
75mm Top Infill Angle
(guide side only)