Using the pump, raise the carriage approximately 500mm from the lower floor.
carriage installation legs.
Lift the platform frame into the lift structure and rest on floor.
Lower the carriage to meet the platform
bolted to the front of the carriage).
Check that the platform frame sits square to the structure and the running clearance is even
(nom. 10mm). The roller assembles are eccentric and provide limited adjustment. Shims are
supplied for side to side adjustment if required. Adjust the platform so that it
tighten fixings.
The spring loaded frame around the platform is the Platform Safety Edge, effective in the up
direction only. Adjustment should not be necessary, but if
on the next page. Check that once activated the switches will return to their original position.
Fit platform deck plates.
Version 9
NOTE:
With the platform at the
uppermost floor, ensure there
is enough flex in the cha
allow for max over travel
raise the carriage approximately 500mm from the lower floor.
Lift the platform frame into the lift structure and rest on floor.
ower the carriage to meet the platform frame. Remove the carriage transit strap (angle
bolted to the front of the carriage). Secure with M12 fixings (View A).
hat the platform frame sits square to the structure and the running clearance is even
(nom. 10mm). The roller assembles are eccentric and provide limited adjustment. Shims are
supplied for side to side adjustment if required. Adjust the platform so that it
frame around the platform is the Platform Safety Edge, effective in the up
ction only. Adjustment should not be necessary, but if required see the adjustment details
on the next page. Check that once activated the switches will return to their original position.
Remove Transit Strap
25
With the platform at the
uppermost floor, ensure there
is enough flex in the chain to
allow for max over travel
raise the carriage approximately 500mm from the lower floor. Remove the
Remove the carriage transit strap (angle
hat the platform frame sits square to the structure and the running clearance is even
(nom. 10mm). The roller assembles are eccentric and provide limited adjustment. Shims are
supplied for side to side adjustment if required. Adjust the platform so that it sits level and
frame around the platform is the Platform Safety Edge, effective in the up
see the adjustment details
on the next page. Check that once activated the switches will return to their original position.
Shim
M12 fixings